| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
ESP32-S3-WROOM-1-N8R2
| Espressif |
SMD module, ESP32-S3R2 with 2 MB PSRAM die inside, 8 MB SPI flash, PCB
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
GBLC03C-N
| Bourns Inc. |
[ESD, 30KA
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MMDT3946
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| ||
MMBT3904T
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| ||
MMBT3906T
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| ||
BSD5C121V
| Bourns Inc. |
TVS BSD5C121V
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
BSD3A051V
| Bourns Inc. |
BSD3A051V
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
BM3407
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| ||
BDFN2C051RF2
| Bourns Inc. |
DFN1006/0402 5V Cj=0.2pF TVS
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
BAV70W
| Jscj |
1 1.25V@150mA 75V 150mA
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
BZX84C10
| Jscj |
10V 300mW 200nA@7V
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
BZT52C15S
| Bourns Inc. |
15V 13.8V~15.6V 100nA@10.5V
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
IRLML6402
| Bourns Inc. |
MOSFET 50mΩ@4.5V,3.7A 20V 3.7A 1P
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
L9012QLT1G
| Lrc |
BJT 225mW 20V 500mA PNP
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
LBZT52C24T1G
| Lrc |
24V 22.8V~25.6V 100nA
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
LBC817-16LT1G
| Lrc |
BJT 225mW 45V 500mA NPN
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
LBSS138WT1G
| Lrc |
MOSFET 150mW 50V 200mA 1N
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
LBZT52C6V8T1G
| Lrc |
6.8V 6.4V~7.2V 2uA
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
LBC856BDW1T1G
| Lrc |
BJT 380mW 65V 100mA PNP
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
MMDT3904
| Jscj |
BJT 200mW 40V 200mA NPN
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
|