| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
VEJ221M1ETR-0810
| Lelon Electronics Corp. |
3333 220μF ±20%
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
V5.5MLA0603NH
| Littelfuse |
5Vrms 0603
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
TL494M/TR
| Hgsemi |
PMIC TL494M/TR
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
TP4054
| Hxy Mosfet |
600mA 4.5V~5.5V
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
RS0104YUTQH12
| Runic |
RS0104YUTQH12
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
RS0204YUTQH12
| Runic |
RS0204YUTQH12
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
BTA16-600BRG
| Umw |
TRIAC 600V 16A
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
BS170FTA
| Umw |
SOT-23
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
MAX16025TE+T
| Analog Devices |
Dual-/Triple-/Quad-Voltage,
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
P6SMB6.8A-E3/52
| Vishay |
Diode: TVS; 600W; 6.8V; 57.1A; unidirectional; ±5%; SMB;
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
OR-1009-TP-G-(GK)
| Orient | Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| ||
OR-1008-TP-G-(GK)
| Orient | Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| ||
SBR2U60S1F-7
| Diodes Incorporated |
SBR 510mV@2A 60V 150uA@60V 2A
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
S2JHE3_A/I
| Vishay |
1.15V@1.5A 600V 1uA@600V 1.5A
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
S8CM-M3/I
| Vishay |
985mV@8A 1kV
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
TPS22917LDBVR
| Texas Instruments |
2A 220mΩ 0V~5.5V
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
SL9451
| Slkor |
SL9451
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
SLESD3Z5V0C
| Slkor |
TVS/ESD SLESD3Z5V0C SOD-323
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
SL247N
| Slkor |
SL247N
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
SL27524
| Slkor |
24V 4A 、
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
|