| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
IL-3P-S3FP2-1
| Jae |
CONN HEADER R/A 3POS 2.5MM
| Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
SI1143-A11-GMR
| Silicon Laboratories Inc. |
SENSOR OPT AMBIENT 10 WFQFN
| Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
DF51A-4P-2DS(50)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
STGW30NC60KD
| Stmicroelectronics |
IGBT 600V 60A TO-247-3
| Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
RGTH60TK65GC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 28A TO-3PFM
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
IL-7P-S3FP2
| Jae |
CONN HEADER R/A 7POS 2.5MM
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
SI5330L-B00229-GMR
| Skyworks |
IC CLK BUFFER 1:4 350MHZ 24QFN
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
RGTH40TK65DGC11
| Rohm Semiconductor |
IGBT TRENCH FS 650V 23A TO-3PFM
| Lead Time: 9-12Days | -- -- | 7200 | Total:
$
| |
MC32PF3000A0EP
| Nxp Semiconductors |
IC POWER MANAGEMENT 48QFN
| Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
FMA4AT148
| Rohm Semiconductor |
TRANS PREBIAS DUAL PNP SMT5
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
MC34PF4210A0ES
| Nxp Semiconductors |
PF4210
| Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
SI8442AB-D-IS
| Skyworks |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
ATS-X53325G-C1-R0
| Advanced Thermal Solutions Inc |
SUPERGRIP HEATSINK 32X32X12.5MM
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
PS9817A-1-AX
| Renesas |
OPTOISO 2.5KV OPEN COLL 8SSOP
| Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
SH8MA4TB1
| Rohm Semiconductor |
MOSFET N/P-CH 30V 9A 8SOP
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
NB3L8504SDTG
| Onsemi |
IC CLK BUFFER 1:4 700MHZ 16TSSOP
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
EMH75T2R
| Rohm Semiconductor |
TRANS 2NPN PREBIAS 0.15W EMT6
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
348RPLF
| Renesas |
IC CLK/FREQ SYNTH 20QSOP
| Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
ATS-X50190G-C1-R0
| Advanced Thermal Solutions Inc |
SUPERGRIP HEATSINK 19X19X12.5MM
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
GBPC3510
| Onsemi |
BRIDGE RECT 1PHASE 1KV 35A GBPC
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
|