| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SI52143-A01AGM
| Skyworks |
IC CLK GEN QUAD PCIE 24QFN
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
ICS511MIT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
ICS511MI
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
ICS511M
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
508MLFT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
508MLF
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
MC32PF8121F1EP
| Nxp Semiconductors |
IC POWER MANAGEMENT I.MX8M MINI
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
ATS-1111-C1-R0
| Advanced Thermal Solutions Inc |
FULL BRICK HEATSINK 117X61X22.9M
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
ICS508MILFT
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
SI8941AD-IS4
| Skyworks |
POWER ISOLATION
| Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
SI823H2CB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
ICS508MILF
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
FOD4118
| Onsemi |
OPTOISOLATOR 5KV TRIAC 6DIP
| Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
SI823H1BB-IS1
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
IL-5P-S3FP2-(N)
| Jae |
CONN HEADER R/A 5POS 2.5MM
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
ICS508MI
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
BD63007MUV-E2
| Rohm Semiconductor |
BD63007MUV IS A THREE-PHASE BRUS
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
TSM-102-03-F-DV
| Samtec |
CONN HEADER SMD 4POS 2.54MM
| Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
ICS508M
| Renesas |
IC CLOCK GENERATOR 8SOIC
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
TSW-102-08-F-S-NA
| Samtec |
CONN HEADER VERT 2POS 2.54MM
| Lead Time: 9-12Days | -- -- | 6600 | Total:
$
|