Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IMD6AT108
Rohm Semiconductor
TRANS NPN/PNP PREBIAS 0.3W SMT6

Lead Time: 9-12Days

-- --
8500
Total: $
ATS-61400R-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 40X40X19.5MM

Lead Time: 9-12Days

-- --
3500
Total: $
514MLF
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
1500
Total: $
GBU8A
Onsemi
BRIDGE RECT 1PHASE 50V 8A GBU

Lead Time: 9-12Days

-- --
5400
Total: $
ICS514M
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
5800
Total: $
FXTH87EH11DT1
Nxp Semiconductors
SENSOR TIRE PRESSURE RF

Lead Time: 9-12Days

-- --
4300
Total: $
SI8941BB-IS
Skyworks
POWER ISOLATION

Lead Time: 9-12Days

-- --
6300
Total: $
RGW80TK65DGVC11
Rohm Semiconductor
IGBT TRENCH FS 650V 39A TO-3PFM

Lead Time: 9-12Days

-- --
1100
Total: $
RGW00TS65GC11
Rohm Semiconductor
IGBT TRENCH FS 650V 96A TO-247N

Lead Time: 9-12Days

-- --
8200
Total: $
ICS513MLF
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
4500
Total: $
ICS513M
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
4700
Total: $
FXTH870502DT1
Nxp Semiconductors
SENSOR TIRE PRESSURE RF

Lead Time: 9-12Days

-- --
8100
Total: $
ICS512MT
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
5200
Total: $
ICS512MIT
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
6100
Total: $
SI1141-M01-GMR
Silicon Laboratories Inc.
SENSOR OPT 850NM IR 10 SMD

Lead Time: 9-12Days

-- --
4000
Total: $
ICS512MI
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
3500
Total: $
ICS512M
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
7500
Total: $
SI8941AB-IS
Skyworks
POWER ISOLATION

Lead Time: 9-12Days

-- --
800
Total: $
ICS511MT
Renesas
IC CLOCK GENERATOR 8SOIC

Lead Time: 9-12Days

-- --
5300
Total: $
77311-124-08LF
Amphenol
CONN HEADER VERT 8POS 2.54MM

Lead Time: 9-12Days

-- --
5100
Total: $
  • 1
  • 6486
  • 6487
  • 6488
  • 6489
  • 6490
  • 6670
Go to