Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MUN5113DW1T1G
Onsemi
TRANS 2PNP PREBIAS 0.25W SOT363

Lead Time: 9-12Days

-- --
2900
Total: $
SMUN5214T1G
Onsemi
TRANS PREBIAS NPN 50V SC70-3

Lead Time: 9-12Days

-- --
2400
Total: $
1-1744429-6
Te Connectivity
3.96 EP HDR ASSY 6P W/PEGS, GW,N

Lead Time: 9-12Days

-- --
6400
Total: $
592502B03400G
Boyd
HEATSINK TO-220 VERT MNT W/TABS

Lead Time: 9-12Days

-- --
9500
Total: $
577102B00000G
Boyd
HEAT SINK TO-220 .375" COMPACT

Lead Time: 9-12Days

-- --
5500
Total: $
576802B00000G
Boyd
HEATSINK TO-220 5W BLK

Lead Time: 9-12Days

-- --
8300
Total: $
371824B00032G
Boyd
HEATSINK BGA W/ADHESIVE TAPE

Lead Time: 9-12Days

-- --
8500
Total: $
507302B00000G
Boyd
HEATSINK TO-220 2.5W LOW PROFILE

Lead Time: 9-12Days

-- --
7000
Total: $
PDTC123EM,315
Nexperia
TRANS PREBIAS NPN 50V SOT883

Lead Time: 9-12Days

-- --
5200
Total: $
530613B00000G
Boyd
HEATSINK TO-220 BLACK 1.18"

Lead Time: 9-12Days

-- --
600
Total: $
531102B02500G
Boyd
HEATSINK TO-220 W/PINS 1.5"TALL

Lead Time: 9-12Days

-- --
2400
Total: $
529901B02500G
Boyd
HEATSINK TO-218 SOLDER PIN

Lead Time: 9-12Days

-- --
6000
Total: $
SMUN2240T1G
Onsemi
TRANS PREBIAS NPN 50V 0.1A SC59

Lead Time: 9-12Days

-- --
1800
Total: $
3-644457-9
Te Connectivity
CONN HEADER R/A 9POS 2.54MM

Lead Time: 9-12Days

-- --
1400
Total: $
1-2132230-8
Te Connectivity
CONN HEADER VERT 18POS 2.5MM

Lead Time: 9-12Days

-- --
3000
Total: $
MKP1847H51025JK2
Vishay
CAP FILM 1UF 5% 500VDC RADIAL

Lead Time: 9-12Days

-- --
4900
Total: $
440053-9
Te Connectivity
CONN HEADER R/A 9POS 2.5MM

Lead Time: 9-12Days

-- --
9100
Total: $
MRF24G300HSR5
Nxp Semiconductors
RF MOSFET GAN 48V NI780

Lead Time: 9-12Days

-- --
1200
Total: $
826631-8
Te Connectivity
CONN HEADER R/A 8POS 2.54MM

Lead Time: 9-12Days

-- --
3900
Total: $
3-644457-8
Te Connectivity
CONN HEADER R/A 8POS 2.54MM

Lead Time: 9-12Days

-- --
8300
Total: $
  • 1
  • 6229
  • 6230
  • 6231
  • 6232
  • 6233
  • 6670
Go to