Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
EPM7128EQC100-10
Intel
IC CPLD 128MC 10NS 100QFP

Lead Time: 9-12Days

-- --
1100
Total: $
5-146288-5
Te Connectivity
CONN HEADER VERT 5POS 2.54MM

Lead Time: 9-12Days

-- --
6100
Total: $
440052-9
Te Connectivity
CONN HEADER VERT 9POS 2.5MM

Lead Time: 9-12Days

-- --
7800
Total: $
10072354-G01-06LF
Amphenol
CONN HEADER R/A 6POS 2MM

Lead Time: 9-12Days

-- --
1300
Total: $
PUMD17,115
Nexperia
TRANS PREBIAS 1NPN 1PNP 6TSSOP

Lead Time: 9-12Days

-- --
8500
Total: $
NGTB35N65FL2WG
Onsemi
IGBT TRENCH FS 650V 70A TO-247-3

Lead Time: 9-12Days

-- --
5500
Total: $
1744110-2
Te Connectivity
CONN HEADER VERT 10POS 3.96MM

Lead Time: 9-12Days

-- --
6400
Total: $
MRFE6VP6300HR5
Nxp Semiconductors
RF MOSFET LDMOS 50V NI780

Lead Time: 9-12Days

-- --
3000
Total: $
7020B-MTG
Boyd
HEATSINK TO-220 TAB FOLD 42.16MM

Lead Time: 9-12Days

-- --
3800
Total: $
529801B02500G
Boyd
HEATSINK TO-218 W/PINS 1.5"TALL

Lead Time: 9-12Days

-- --
8200
Total: $
6021BG
Boyd
HEATSINK TO-220 TABS BLACK

Lead Time: 9-12Days

-- --
4200
Total: $
534202B03453G
Boyd
BOARD LEVEL HEATSINK .5" TO-220

Lead Time: 9-12Days

-- --
1900
Total: $
PDTC115EUF
Nexperia
TRANS PREBIAS NPN SOT323

Lead Time: 9-12Days

-- --
9800
Total: $
DMP3056LSDQ-13
Diodes Incorporated
MOSFET 2P-CH 30V 6.9A 8SO

Lead Time: 9-12Days

-- --
5800
Total: $
573100D00000G
Boyd
TOP MOUNT HEATSINK .4" D-PAK

Lead Time: 9-12Days

-- --
0
Total: $
7019B-MTG
Boyd
HEATSINK TO-220 TAB FOLD 25.4MM

Lead Time: 9-12Days

-- --
4500
Total: $
7023B-MTG
Boyd
BOARD LEVEL HEATSINK 1.95" TO220

Lead Time: 9-12Days

-- --
6000
Total: $
MCIMX6Q6AVT10AE
Nxp Semiconductors
IC MPU I.MX6Q 1.0GHZ 624FCBGA

Lead Time: 9-12Days

-- --
8100
Total: $
PMBT3906YS,115
Nexperia
TRANS 2PNP 40V 200MA 6-TSSOP

Lead Time: 9-12Days

-- --
8200
Total: $
PUMH9,125
Nexperia
TRANS PREBIAS 2NPN 50V 6TSSOP

Lead Time: 9-12Days

-- --
300
Total: $
  • 1
  • 6227
  • 6228
  • 6229
  • 6230
  • 6231
  • 6670
Go to