| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
PDTC123TT,215
| Nexperia |
TRANS PREBIAS NPN 50V TO236AB
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
SI8621AB-B-IS
| Skyworks |
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
68020-120HLF
| Amphenol |
CONN HEADER R/A 20POS 2.54MM
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
2-292132-2
| Te Connectivity |
CONN HEADER VERT 2POS 2MM
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
MCIMX6Q6AVT10AC
| Nxp Semiconductors |
IC MPU I.MX6Q 1.0GHZ 624FCBGA
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
2SK1070PICTL-E
| Renesas |
JFET N-CH 22V 50MA 3MPAK
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
2-103634-9
| Te Connectivity |
CONN HEADER R/A 2POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
PI6C20400LEX
| Diodes Incorporated |
IC CLOCK BUFF DIFF 28-TSSOP
| Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
1744486-6
| Te Connectivity |
CONN HEADER VERT 6POS 3.96MM
| Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
A2I20H060NR1
| Nxp Semiconductors |
RF MOSFET LDMOS 28V TO270-15
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
643130-1
| Te Connectivity |
CONN HEADER VERT 4POS 3.96MM
| Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
BC856S,125
| Nexperia |
TRANS 2PNP 65V 100MA 6-TSSOP
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
SMUN2232T1G
| Onsemi |
TRANS PREBIAS NPN 50V 0.1A SC59
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
1-1744426-1
| Te Connectivity |
CONN HEADER R/A 11POS 2.5MM
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
542502B00000G
| Boyd |
HEATSINK TO-220 TAB BLACK
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
V2023B
| Assmann Wsw Components |
HEATSINK CPU XCUT
| Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
MCIMX6Q7CZK08AE
| Nxp Semiconductors |
IC MPU I.MX6Q 800MHZ 569MAPBGA
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
563002B00000G
| Boyd |
HEATSINK TO-220 VERT MNT 1.18"
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
573300D00000G
| Boyd |
TOP MOUNT HEATSINK .4" D2PAK
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
6030B-TTG
| Boyd |
THM,10594B-TT REV BB(COPPER)G
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
|