| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
576802B03900G
| Boyd |
HEATSINK TO220 CLIPON W/TAB.75"
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
DGD2103AS8-13
| Diodes Incorporated |
IC GATE DRVR HALF-BRIDGE 8SO
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
504102B00000G
| Boyd |
HEATSINK TO-220 PWR CLR .700"
| Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
FGHL50T65SQ
| Onsemi |
IGBT 650V 100A TO-247-3
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
DGD2104AS8-13
| Diodes Incorporated |
IC GATE DRVR HALF-BRIDGE 8SO
| Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
577202B04000G
| Boyd |
HEATSINK TO-220 .500" COMPACT
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
T1235H-6I
| Stmicroelectronics |
TRIAC ALTERNISTOR 600V 12A TO220
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
BM94803AEKU-Z
| Rohm Semiconductor |
IC AUDIO SGNL PROCESSOR 128HTQFP
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
507002B00000G
| Boyd |
HEATSINK TO-220 BLK
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
504222B00000G
| Boyd |
HEATSINK TO-220 PWR CLR 1.45"10W
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
1744156-3
| Te Connectivity |
CONN HEADER R/A 3POS 3.96MM
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
103672-3
| Te Connectivity |
CONN HEADER R/A 4POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
77311-402-06LF
| Amphenol |
CONN HEADER VERT 6POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
MPC8544VJAQGA
| Nxp Semiconductors |
IC MPU MPC85XX 1.0GHZ 783FCPBGA
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
PDTD113ZQAZ
| Nexperia |
TRANS PREBIAS NPN 50V 0.5A 3DFN
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
PDTC144TM,315
| Nexperia |
TRANS PREBIAS NPN 50V SOT883
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
77311-822-09LF
| Amphenol |
CONN HEADER VERT 9POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
7109DG
| Boyd |
TOP MOUNT HEATSINK .45" D2PAK
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
374324B00035G
| Boyd |
HEATSINK BGA W/ADHESIVE TAPE
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
20021112-00018T1LF
| Amphenol |
CONN HEADER R/A 18POS 1.27MM
| Lead Time: 9-12Days | -- -- | 4200 | Total:
$
|