| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MKT1813447405
| Vishay |
CAP FILM 0.47UF 10% 400VDC AXIAL
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
10114828-13102LF
| Amphenol |
CONN HEADER SMD 2POS 1.25MM
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
SI8662EB-B-IU
| Skyworks |
DGTL ISOLTR 2.5KV 6CH GP 16-SSOP
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
MKT1813522065M
| Vishay |
CAP FILM 2.2UF 10% 63VDC AXIAL
| Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
B32564J6225K000
| Tdk |
CAP FILM 2.2UF 10% 400VDC 2DIP
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
1-292232-0
| Te Connectivity |
CONN HEADER SMD 10POS 1.5MM
| Lead Time: 9-12Days | -- -- | 200 | Total:
$
| |
CPH3910-TL-E
| Onsemi |
JFET N-CH 25V 50MA 3CPH
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
95000-104TRLF
| Amphenol |
CONN HEADER SMD R/A 4POS 2MM
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
SI8663BB-B-IU
| Skyworks |
DGTL ISOLTR 2.5KV 6CH GP 16-SSOP
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
ZXMN2A04DN8TA
| Diodes Incorporated |
MOSFET 2N-CH 20V 5.9A 8SO
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
1-292232-8
| Te Connectivity |
CONN HEADER SMD 18POS 1.5MM
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
B32564J6475K000
| Tdk |
CAP FILM 4.7UF 10% 400VDC 2DIP
| Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
1-292232-7
| Te Connectivity |
CONN HEADER SMD 17POS 1.5MM
| Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
1-292232-5
| Te Connectivity |
CONN HEADER SMD 15POS 1.5MM
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
PBSS4160PANPSX
| Nexperia |
TRANS NPN/PNP 60V 1A DFN2020D-6
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
10114831-10108LF
| Amphenol |
CONN HEADER R/A 8POS 1.25MM
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
6-1747072-3
| Te Connectivity |
GRACE INERTIA CONN 2.5 ON TAPE H
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
F17724222290
| Vishay |
CAP FILM 0.22UF 20% 630VDC RAD
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
LS2088ASE7V1B
| Nxp Semiconductors |
IC MPU QORIQ 2.0GHZ 1292FCPBGA
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
PDTC123TU,115
| Nexperia |
TRANS PREBIAS NPN 50V SOT323
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
|