| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
FS32K146HAT0MLHR
| Nxp Semiconductors |
S32K146 32-BIT MCU ARM
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
JEB05D3
| Jiejie Microelectronics |
TVS JEB05D3 SOD-323
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
MAX706SESA+T
| Analog Devices |
+3V Voltage Monitoring, Low-Cost, P
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MMBF5485
| Onsemi |
RF MMBF5485 SOT-23
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
PCA9671BS,118
| Nxp Semiconductors |
I-O--16-I²C-1MHz-24-HVQFN4x4
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
10D181K
| Ruilon | Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| ||
BNESD9L3.3ST5G
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| ||
BAS70WS
| Bourns Inc. |
1V@15mA 70V 100nA@50V 70mA SOD-323
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
CD4002BM96
| Texas Instruments |
-IC-2--14-SOIC
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
MPX5700D
| Nxp Semiconductors |
SENSOR DIFF PRESS 101.5PSI MAX
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
P6KE6.8A
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| ||
SMAJ16A
| Bourns Inc. |
TVS/ESD SMAJ16A SMADO-214AC
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
SMD1206-110/24N
| Bourns Inc. |
/Fuse SMD1206-110/24
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
SMD1812-150/33N
| Bourns Inc. |
/Fuse SMD1812-150/33N
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
SMD1812-050/60N
| Bourns Inc. | Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| ||
VEJ470M1HTR-0607
| Lelon Electronics Corp. |
6.3mm*7.7mm 47μF ±20% 50VDC
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
S9014
| Bourns Inc. |
BJT 200mW 45V 100mA NPN SOT-23
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
SD103AX
| Bourns Inc. |
40V 350mA SOD-523
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
TPS54140ADGQR
| Texas Instruments |
DC-DC 3.5V~42V 800mV~39V MSOP-10-EP
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
CC0603JRX7R6BB105
| Yageo |
MLCC 10V ±5% 1uF X7R 0603
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
|