| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MMBV409LT1
| Onsemi |
DIODE TUNING SS 20V SOT-23
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
77313-SAE-14LF
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
77313-899-16LF
| Amphenol |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
77313-122R14LF
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MMBV409LT1G
| Onsemi |
DIODE TUNING SS 20V SOT-23
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
MMBV809LT3G
| Onsemi |
DIODE TUNING SS 20V SOT-23
| MPQ: 10000 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
MMVL109T1G
| Onsemi |
DIODE TUNING 30V SOD-323
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
MV104RLRAG
| Onsemi |
DIODE TUNING FM DUAL 32V TO-92
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
67996-114HALF
| Amphenol |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 250 Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
MV209RLRA
| Onsemi |
DIODE TUNING EPICAP 30V TO-92
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
MV2101
| Onsemi |
DIODE TUNING 30V 6.8PF TO92-2
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
850-10-005-30-001101
| Preci-Dip |
CONN HEADER SMD 5POS 1.27MM
| MPQ: 720 Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
MV2105
| Onsemi |
DIODE TUNING 30V 15PF TO92-2
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
0705530141
| Molex |
CONN HEADER R/A 2POS 2.54MM
| MPQ: 2880 Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
B15B-XASK-1N-A(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 15POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
DF65-5P-1.7V(78)
| Hirose Electric Co.,Ltd. |
CONN HEADER SMD
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
BB 857 E7902
| Infineon |
DIODE VAR CAP 30V 20MA SCD-80
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
BBY 57-02W E6327
| Infineon |
DIODE TUNING 10V 20MA SCD-80
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
ZC833BTA
| Diodes Incorporated |
DIODE VARACTOR CAP SOT23-3
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
ZC835BTA
| Diodes Incorporated |
DIODE VARACTOR CAP SOT23-3
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
|