Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
86837-110H
Amphenol
CONN HEADER VERT 10POS 2.54MM

Lead Time: 9-12Days

-- --
2000
Total: $
BFC230363274
Vishay
CAP FILM 0.27UF 10% 630VDC RAD

Lead Time: 9-12Days

-- --
700
Total: $
850-10-004-40-001101
Preci-Dip
CONN HEADER SMD R/A 4POS 1.27MM

MPQ: 1500

Lead Time: 9-12Days

-- --
5300
Total: $
BFC230361274
Vishay
CAP FILM 0.27UF 10% 630VDC RAD

Lead Time: 9-12Days

-- --
6900
Total: $
MKP385420085JKP2T0
Vishay
CAP FILM 0.2UF 5% 850VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
9200
Total: $
7-292228-0
Te Connectivity
CONN HEADER SMD R/A 20POS 1.5MM

Lead Time: 9-12Days

-- --
8700
Total: $
MKP385420085JKM2T0
Vishay
CAP FILM 0.2UF 5% 850VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5200
Total: $
5-1971846-2
Te Connectivity
CONN HEADER VERT 2POS 5MM

Lead Time: 9-12Days

-- --
2400
Total: $
BFC242011004
Vishay
CAP FILM 0.1UF 2% 630VDC RADIAL

MPQ: 650

Lead Time: 9-12Days

-- --
8500
Total: $
9-1971846-2
Te Connectivity
CONN HEADER VERT 2POS 5MM

Lead Time: 9-12Days

-- --
9600
Total: $
B32563J1106K000
Tdk
CAP FILM 10UF 10% 100VDC 2DIP

MPQ: 3840

Lead Time: 9-12Days

-- --
9300
Total: $
BFC233610154
Vishay
CAP FILM 0.15UF 20% 630VDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
8500
Total: $
BFC247990022
Vishay
CAP FILM 0.43UF 5% 250VDC RADIAL

MPQ: 800

Lead Time: 9-12Days

-- --
3000
Total: $
0367570024
Molex
CONN HEADER VERT 6POS 6.35MM

Lead Time: 9-12Days

-- --
1400
Total: $
BFC247955114
Vishay
CAP FILM 0.11UF 5% 400VDC RADIAL

MPQ: 800

Lead Time: 9-12Days

-- --
8200
Total: $
0878320616
Molex
CONN HEADER SMD 6POS 2MM

MPQ: 3720

Lead Time: 9-12Days

-- --
700
Total: $
MKT1813533254R
Vishay
CAP FILM 3.3UF 5% 250VDC AXIAL

MPQ: 300

Lead Time: 9-12Days

-- --
9500
Total: $
0533980476
Molex
CONN HEADER SMD 4POS 1.25MM

Lead Time: 9-12Days

-- --
700
Total: $
420B1V0320
On-Shore Technology,Inc.
CONN HEADER VERT 3POS 4.2MM

MPQ: 180

Lead Time: 9-12Days

-- --
3100
Total: $
MKT1813533254G
Vishay
CAP FILM 3.3UF 5% 250VDC AXIAL

MPQ: 450

Lead Time: 9-12Days

-- --
2100
Total: $
  • 1
  • 5233
  • 5234
  • 5235
  • 5236
  • 5237
  • 6854
Go to