Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TPS7A0522PDBVR
Texas Instruments
IC: voltage regulator; LDO,fixed; 2.2V; 0.2A; SOT23-5; SMD;

Lead Time: 9-12Days

-- --
1300
Total: $
WFR1N4148WT
Cygwayon
SOD-523

Lead Time: 9-12Days

-- --
4900
Total: $
US1R_R1_00001
Panjit
1.9V@1A 1.3kV 1A

Lead Time: 9-12Days

-- --
1900
Total: $
USB2513BI-AEZG
Microchip
USB--USB-2.0-USB--36-QFN6x6

Lead Time: 9-12Days

-- --
3300
Total: $
ELM3052
Aote

Lead Time: 9-12Days

-- --
8700
Total: $
PS2701-1-L
Aote
- PS2701-1-L SOP-4

Lead Time: 9-12Days

-- --
9300
Total: $
PS2805-1(AT)
Aote

Lead Time: 9-12Days

-- --
9900
Total: $
SMCJ24A/TR13
Yageo

Lead Time: 9-12Days

-- --
6500
Total: $
1-2199230-6
Te Connectivity
CONN EDGE DUAL FMALE 67POS

Lead Time: 9-12Days

-- --
6700
Total: $
PJA3441-AU_R1_000A1
Panjit
MOSFET 1.25W 40V 3.1A 1P

Lead Time: 9-12Days

-- --
9700
Total: $
WE05DRF-B
Cygwayon
Single Channel

Lead Time: 9-12Days

-- --
4500
Total: $
WS05DLC-B
Cygwayon

Lead Time: 9-12Days

-- --
2300
Total: $
CSD17501Q5A
Texas Instruments
MOSFET CSD17501Q5A

Lead Time: 9-12Days

-- --
4300
Total: $
MOC3041M
Aote
MOC3041M DIP-6

Lead Time: 9-12Days

-- --
3700
Total: $
TXU0104RUTR
Texas Instruments
/ TXU0104RUTR

Lead Time: 9-12Days

-- --
700
Total: $
5352332-1
Te Connectivity
Hard Metric Backplane Connectors, PCB Mount Header, ≤1 Gb/s, 22 Column, 7 Row, Mezzanine, 154 Position, 2 mm [.078 in] Centerline, Z-PACK 2mm

Lead Time: 9-12Days

-- --
100
Total: $
AW21036QNR
Awinic
LED

Lead Time: 9-12Days

-- --
300
Total: $
ATM3063-CUH-SE
Aote
ATM3063-CuH-SE SOP-4

Lead Time: 9-12Days

-- --
5100
Total: $
AT1019-CUH-L
Aote
- AT1019-CuH-L LSOP-4

Lead Time: 9-12Days

-- --
8900
Total: $
AT817C-FEH-DE
Aote
- AT817C-FeH-DE DIP-4

Lead Time: 9-12Days

-- --
2700
Total: $
  • 1
  • 494
  • 495
  • 496
  • 497
  • 498
  • 6854
Go to