| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
10144041-11011LF
| Amphenol |
0.8MM PITCH RA HEADER SM
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
54102-G0803LF
| Amphenol |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 400 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
M20-9741146
| Harwin |
CONN HEADER R/A 22POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
X9400WS24IZ-2.7
| Renesas |
IC DGTL POT 10KOHM 64TAP 24SOIC
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
800-10-004-40-001101
| Preci-Dip |
CONN HEADER SMD R/A 4POS 2.54MM
| MPQ: 2300 Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
SBH11-NBPC-D07-ST-BK
| Sullins Connector Solutions |
CONN HEADER VERT 14POS 2.54MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
2016450160
| Molex |
SPOT-ON 1.5 DL PLG ASSY WON NAT
| MPQ: 450 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
DS1806-010+
| Analog Devices |
IC DGTL POT 10KOHM 64TAP 20DIP
| Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
TSM-103-01-TM-SV-TR
| Samtec |
CONN HEADER SMD 3POS 2.54MM
| MPQ: 350 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
X9259UV24Z
| Renesas |
IC DGT POT 50KOHM 256TAP 24TSSOP
| MPQ: 62 Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
DF63C-3P-3.96DS
| Hirose Electric Co.,Ltd. |
CONN HDR 3.96MM R/A
| MPQ: 100 Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
AD7376ARUZ100
| Analog Devices |
IC DGT POT 100KOHM 128TP 14TSSOP
| MPQ: 96 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
890-18-005-10-003101
| Preci-Dip |
CONN HEADER VERT 5POS 2.54MM
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
X9250US24Z-2.7
| Renesas |
IC DGTL POT 50KOHM 256TAP 24SOIC
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
98424-S52-04LF
| Amphenol |
CONN HEADER SMD 4POS 2MM
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
X9250TS24Z-2.7
| Renesas |
IC DGT POT 100KOHM 256TAP 24SOIC
| Lead Time: 9-12Days | -- -- | 7200 | Total:
$
| |
X9241AMSIZ
| Renesas |
IC DGT POT 2/10/10/50KOHM 20SOIC
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
98414-S08-04LF
| Amphenol |
CONN HEADER VERT 4POS 2MM
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
X9241AUVIZ
| Renesas |
IC DGTL POT 50KOHM 64TAP 20TSSOP
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
98414-S06-04LF
| Amphenol |
CONN HEADER VERT 4POS 2MM
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
|