| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
TSM-102-04-L-SV-TR
| Samtec |
CONN HEADER SMD 2POS 2.54MM
| MPQ: 475 Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
0026483083
| Molex |
CONN HEADER VERT 8POS 3.96MM
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
X9317UV8IZT1
| Renesas |
IC DGTL POT 50KOHM 100TAP 8TSSOP
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
X9317WV8IZT1
| Renesas |
IC DGTL POT 10KOHM 100TAP 8TSSOP
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
AD5253BRUZ50
| Analog Devices |
IC DGTL POT 50KOHM 64TAP 20TSSOP
| MPQ: 75 Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
X9317UV8Z-2.7
| Renesas |
IC DGTL POT 50KOHM 100TAP 8TSSOP
| MPQ: 100 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
292164-7
| Te Connectivity |
CONN HEADER R/A 7POS 2MM
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
X9317WV8Z-2.7
| Renesas |
IC DGTL POT 10KOHM 100TAP 8TSSOP
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
X9317US8IZ-2.7
| Renesas |
IC DGTL POT 50KOHM 100TAP 8SOIC
| MPQ: 100 Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
0026580070
| Molex |
CONN HEADER VERT 7POS 3.96MM
| Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
AD5204BRUZ100
| Analog Devices |
IC DGT POT 100KOHM 256TP 24TSSOP
| MPQ: 62 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
5-102974-3
| Te Connectivity |
CONN HEADER R/A 3POS 2.54MM
| MPQ: 10000 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
CAT5241WI-10-T1
| Onsemi |
IC POT DIG 10K 64TAP 4CH 20SOIC
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
MAX5421AEUB+T
| Analog Devices |
IC DGTL POT 15KOHM 4TAP 10UMAX
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
77311-1AN-02LF
| Amphenol |
BERGSTIK HDR
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
X9317WM8IZ-2.7T1
| Renesas |
IC DGTL POT 10KOHM 100TAP 8MSOP
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
CAT5251YI-00-T2
| Onsemi |
IC DGT POT 100KOHM 256TP 24TSSOP
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
350-80-105-01-609101
| Preci-Dip |
CONN HEADER VERT 3POS 5.08MM
| MPQ: 1800 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
CAT5251YI-50-T2
| Onsemi |
IC DGT POT 50KOHM 256TAP 24TSSOP
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
10129382-916002BLF
| Amphenol |
CONN HEADER R/A 16POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4200 | Total:
$
|