| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
0416620002
| Molex |
CONN HEADER R/A 3POS 3.96MM
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
800-V3-002-40-001191
| Preci-Dip |
CONN HEADER SMD R/A 2POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
894-80-012-10-001101
| Preci-Dip |
CONN HEADER VERT 12POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
10114829-11113LF
| Amphenol |
CONN HEADER VERT 13POS 1.25MM
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
146090-4
| Te Connectivity |
CONN HEADER VERT 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
800-80-006-30-001101
| Preci-Dip |
CONN HEADER SMD 6POS 2.54MM
| MPQ: 1200 Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
0022287110
| Molex |
CONN HEADER R/A 11POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
890-70-011-20-001101
| Preci-Dip |
CONN HEADER R/A 11POS 2.54MM
| MPQ: 1090 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
BH8B-XH-2(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 8POS 2.5MM
| MPQ: 150 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
S05B-XASS-1N-BN(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER R/A 5POS 2.5MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
0022283054
| Molex |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
DF1-6P-2.5DS(05)
| Hirose Electric Co.,Ltd. |
CONN HEADER R/A 6POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
DF13-4P-1.25DSA(75)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 4POS 1.25MM
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
2-1971845-3
| Te Connectivity |
CONN HEADER VERT 3POS 5MM
| Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
0026503099
| Molex |
CONN HEADER VERT 9POS 3.96MM
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
0026503092
| Molex |
CONN HEADER VERT 9POS 3.96MM
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
MKP385456063JKP2T0
| Vishay |
CAP FILM 0.56UF 5% 630VDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
MKP385456063JKM2T0
| Vishay |
CAP FILM 0.56UF 5% 630VDC RADIAL
| MPQ: 100 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
MKP385456063JKI2B0
| Vishay |
CAP FILM 0.56UF 5% 630VDC RADIAL
| MPQ: 125 Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
MKP385433085JIP2T0
| Vishay |
CAP FILM 0.33UF 5% 850VDC RADIAL
| MPQ: 150 Lead Time: 9-12Days | -- -- | 6200 | Total:
$
|