Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BFC238304304
Vishay
CAP FILM 0.3UF 5% 250VDC RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
1400
Total: $
BFC238372272
Vishay
CAP FILM 2700PF 5% 2.5KVDC RAD

MPQ: 600

Lead Time: 9-12Days

-- --
9100
Total: $
MTLW-102-06-F-S-145
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2200
Total: $
MKP1845410634
Vishay
CAP FILM 0.1UF 5% 630VDC AXIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
1500
Total: $
MTLW-102-06-F-S-140
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4600
Total: $
MKP1845347134
Vishay
CAP FILM 0.047UF 5% 1.6KVDC AXL

MPQ: 1000

Lead Time: 9-12Days

-- --
7900
Total: $
MTLW-102-06-F-S-135
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4800
Total: $
MKT-A 1,0 UF/250V.
Visaton
CAP FILM FOIL

MPQ: 10

Lead Time: 9-12Days

-- --
900
Total: $
BFC236861224
Vishay
CAP FILM 0.22UF 10% 630VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
7500
Total: $
MTLW-102-06-F-S-125
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
BFC236851474
Vishay
CAP FILM 0.47UF 10% 400VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9400
Total: $
BFC237590224
Vishay
CAP FILM 0.039UF 5% 1KVDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
4300
Total: $
MTLW-102-05-FM-S-169
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4200
Total: $
BFC237590177
Vishay
CAP FILM 0.012UF 5% 2KVDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
1400
Total: $
MKT1813568016G
Vishay
CAP FILM 6.8UF 20% 100VDC AXIAL

MPQ: 600

Lead Time: 9-12Days

-- --
8400
Total: $
BFC237525303
Vishay
CAP FILM 0.03UF 3.5% 1KVDC RAD

MPQ: 600

Lead Time: 9-12Days

-- --
300
Total: $
BFC237521303
Vishay
CAP FILM 0.03UF 3.5% 1KVDC RAD

MPQ: 600

Lead Time: 9-12Days

-- --
8800
Total: $
MTLW-102-05-F-S-169
Samtec
CONN HEADER VERT 2POS 2.54MM

Lead Time: 9-12Days

-- --
4500
Total: $
MKP383462040JKP2T0
Vishay
CAP FILM 0.62UF 5% 400VDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
2900
Total: $
MTLW-102-05-F-S-160
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1700
Total: $
  • 1
  • 4183
  • 4184
  • 4185
  • 4186
  • 4187
  • 6670
Go to