| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MPC9824AC
| Renesas |
CLOCK GENERATORS & SUPPORT PRODU
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
MPC9824ACR2
| Renesas |
IC PLL CLOCK GENERATOR 32-LQFP
| Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
57102-F08-05LF
| Amphenol |
CONN HEADER VERT 10POS 2MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
MPC9850VM
| Renesas |
IC PLL CLOCK GENERATOR 100MAPBGA
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
1-292168-2
| Te Connectivity |
CONN HEADER R/A 12POS 2MM
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
1-1744418-5
| Te Connectivity |
CONN HEADER VERT 15POS 2.5MM
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
M20-8760446R
| Harwin |
CONN HDR 2.54MM SMT 8POS
| Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
DF13C-2P-1.25V(77)
| Hirose Electric Co.,Ltd. |
CONN HDR 2POS 1.25MM SMD STR
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
MPC9865VMR2
| Renesas |
IC PLL CLOCK GENERATOR 100MAPBGA
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
DF3E-5P-2V(51)
| Hirose Electric Co.,Ltd. |
CONN HEADER SMD 5POS 2MM
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
VF2510BG
| Renesas |
IC PLL CLK DRIVER 3.3V 24-TSSOP
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
M22-2020705
| Harwin |
CONN HEADER VERT 14POS 2MM
| MPQ: 500 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
DF13B-4P-1.25V(51)
| Hirose Electric Co.,Ltd. |
CONN HEADER SMD 4POS 1.25MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
DF13-5P-1.25DSA(75)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 5POS 1.25MM
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
0022059058
| Molex |
CONN HEADER R/A 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
VF2510BGLF
| Renesas |
IC PLL CLK DRIVER 3.3V 24-TSSOP
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
0022283055
| Molex |
CONN HEADER VERT 5POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
VF2510BGLFT
| Renesas |
IC PLL CLK DRIVER 3.3V 24-TSSOP
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
VF2510BGLN
| Renesas |
IC PLL CLK DRIVER 3.3V 24-TSSOP
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
VF2510BGLNT
| Renesas |
IC PLL CLK DRIVER 3.3V 24-TSSOP
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
|