| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SMH100-LPPE-S06-SD-BK
| Sullins Connector Solutions |
CONN HEADER SMD 6POS 1MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
SMH100-LPPE-S06-SC-BK
| Sullins Connector Solutions |
CONN HEADER SMD 6POS 1MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
5V41066PGG
| Renesas |
IC CLK GEN SPRED SPECTRM 20TSSOP
| MPQ: 74 Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
LT8500ETJ#PBF
| Analog Devices |
IC PWM GENERATOR 56-TLAQFN
| MPQ: 61 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
20021211-00008T1LF
| Amphenol |
CONN HEADER VERT 8POS 1.27MM
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
SI5338C-B01917-GM
| Skyworks |
I2C-PROGRAMMABLE CLOCK GENERATOR
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
54202-G0804ALF
| Amphenol |
CONN HEADER SMD 8POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
SI5338H-B-GM
| Skyworks |
IC CLK GENERATOR I2C PROGR 24QFN
| MPQ: 490 Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
292164-8
| Te Connectivity |
CONN HEADER R/A 8POS 2MM
| Lead Time: 9-12Days | -- -- | 8000 | Total:
$
| |
AD9523-1BCPZ
| Analog Devices |
IC INTEGER-N CLCK GEN 72LFCSP
| MPQ: 41 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
HTMS-103-21-F-S
| Samtec |
.050" X .100" HIGH-TEMP THROUGH-
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
AD9548BCPZ
| Analog Devices |
IC CLOCK GEN/SYNCHRONIZR 88LFCSP
| MPQ: 16 Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
SI52111-B3-GM2
| Skyworks |
IC OSC PCI EXPRESS 1OUTPUT
| MPQ: 100 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
SI52112-A1-GM2
| Skyworks |
IC OSC PCI EXPRESS 2OUTPUT
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
TSW-203-25-T-S-RA
| Samtec |
CONN HDR .200" 3POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
SI52142-A01AGM
| Skyworks |
IC CLK GENERATOR 200MHZ 24QFN
| MPQ: 490 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
TMS-105-02-T-S-RA
| Samtec |
.050" (1.27MM) MICRO HEADER
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
TMS-104-01-T-S
| Samtec |
.050" (1.27MM) MICRO HEADER
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
PI6C557-03BQE
| Diodes Incorporated |
IC CLOCK GENERATOR 16QSOP
| MPQ: 97 Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
TMS-103-02-T-D-RA
| Samtec |
.050" (1.27MM) MICRO HEADER
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
|