| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
TSM-103-04-L-SV-TR
| Samtec |
CONN HEADER SMD 3POS 2.54MM
| MPQ: 475 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
SI52111-B3-GM2R
| Skyworks |
IC CLOCK GENERATOR PCIE 10TDFN
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
10137924-0212LF
| Amphenol |
CONN PWR3.0 R/A SMT
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
SI52112-A1-GM2R
| Skyworks |
IC OSC PCI EXPRESS 2OUT 10TDFN
| Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
1-2232511-4
| Te Connectivity |
CONN HEADER VERT 4POS 5MM
| MPQ: 1600 Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
PI6CDBL401BZHIEX
| Diodes Incorporated |
3.3V 1:4 LOW POWER PCIE BUFFER
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
77313-457-12LF
| Amphenol |
CONN HEADER VERT 12POS 2.54MM
| Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
0022287130
| Molex |
CONN HEADER R/A 13POS 2.54MM
| Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
SI52142-A01AGMR
| Skyworks |
IC CLK GENERATOR 200MHZ 24QFN
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
B06B-PASK-GZ
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER VERT 6POS 2MM
| Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
SI52112-A2-GM2R
| Skyworks |
IC OSC PCI EXPRESS 2OUT 10TDFN
| Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
1-2029171-0
| Te Connectivity |
CONN HEADER VERT 10POS 4.2MM
| Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
SI53102-A2-GMR
| Skyworks |
IC CLK BUFFER PCIE 1:2 8TDFN
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
643495-4
| Te Connectivity |
CONN HEADER VERT 5POS 3.96MM
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
008261023213854
| Kyocera Avx Components |
CONN HEADER
| MPQ: 5000 Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
DF3E-6P-2V(51)
| Hirose Electric Co.,Ltd. |
CONN HEADER SMD 6POS 2MM
| Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
557GI-03LFT
| Renesas |
IC CLK SOURCE PCI EXPRSS 16TSSOP
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
BU2360FV-FE2
| Rohm Semiconductor |
IC CLOCK GEN DVD VIDEO SSOP16
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
9DBL411AKLFT
| Renesas |
IC FANOUT BUFFER 4OUTPUT 20-QFN
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
DF3E-8P-2H(21)
| Hirose Electric Co.,Ltd. |
CONN HEADER SMD R/A 8POS 2MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 800 | Total:
$
|