Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
10129383-916002ALF
Amphenol
CONN HEADER SMD 16POS 2.54MM

MPQ: 150

Lead Time: 9-12Days

-- --
600
Total: $
MAX6505UTP005+T
Analog Devices
IC TEMP SWITCH DL TRIP SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
MAX6505UTP000+T
Analog Devices
IC TEMP SWITCH DL TRIP SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
4500
Total: $
890-80-028-10-001101
Preci-Dip
CONN HEADER VERT 28POS 2.54MM

MPQ: 1000

Lead Time: 9-12Days

-- --
2400
Total: $
MAX6505UTP010+T
Analog Devices
IC TEMP SWITCH DL TRIP SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
9400
Total: $
0702800634
Molex
CONN HEADER VERT 12POS 2.54MM

MPQ: 1750

Lead Time: 9-12Days

-- --
8300
Total: $
0903250022
Molex
CONN HEADER VERT 22POS 1.27MM

MPQ: 1200

Lead Time: 9-12Days

-- --
3200
Total: $
G881A16102T3EU
Amphenol
CONN HEADER VERT 16POS 3MM

MPQ: 210

Lead Time: 9-12Days

-- --
7400
Total: $
MAX6505UTN030+T
Analog Devices
THERMOSTAT 30DEGC ACT LO SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
1300
Total: $
TSW-204-24-T-S
Samtec
CONN HDR .200" 4POS

MPQ: 1

Lead Time: 9-12Days

-- --
8200
Total: $
MAX6505UTP020+T
Analog Devices
IC TEMP SWITCH DL TRIP SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
4500
Total: $
TMS-103-01-L-S-RA
Samtec
.050" (1.27MM) MICRO HEADER

MPQ: 1

Lead Time: 9-12Days

-- --
7200
Total: $
MAX6505UTP025+T
Analog Devices
THERMOSTAT 25DEGC ACT LO SOT23-6

MPQ: 2500

Lead Time: 9-12Days

-- --
500
Total: $
MAX6670AUB50+T
Analog Devices
THERMOSTAT 50DEGC ACT LOW 10UMAX

MPQ: 2500

Lead Time: 9-12Days

-- --
5900
Total: $
MAX6670AUB45+T
Analog Devices
THERMOSTAT 45DEGC ACT LOW 10UMAX

MPQ: 2500

Lead Time: 9-12Days

-- --
9800
Total: $
MAX6670AUB65+T
Analog Devices
THERMOSTAT 65DEGC ACT LOW 10UMAX

MPQ: 2500

Lead Time: 9-12Days

-- --
9300
Total: $
MAX6668AUA50+T
Analog Devices
THERMOSTAT 50DEGC ACT LOW 8UMAX

MPQ: 2500

Lead Time: 9-12Days

-- --
4800
Total: $
MAX6670AUB40+T
Analog Devices
THERMOSTAT 40DEGC ACT LOW 10UMAX

MPQ: 2500

Lead Time: 9-12Days

-- --
3700
Total: $
MTLW-103-06-F-S-140
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4300
Total: $
MTLW-103-06-F-S-135
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6800
Total: $
  • 1
  • 3538
  • 3539
  • 3540
  • 3541
  • 3542
  • 6854
Go to