| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
75867-202LF
| Amphenol |
CONN HEADER R/A 14POS 2.54MM
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
GRPB091VWCN-RC
| Sullins Connector Solutions |
CONN HEADER R/A 9POS 1.27MM
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
95278-401B10LF
| Amphenol |
CONN HEADER SMD 10POS 2.54MM
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
75880-337LF
| Amphenol |
CONN HEADER VERT 12POS 2.54MM
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
1-2132230-7
| Te Connectivity |
CONN HEADER VERT 17POS 2.5MM
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
008283061100868
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
008283111100000+
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
008283091100001+
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
008283111100003+
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
008283111100001+
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
008283116100000+
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
008283111100002+
| Kyocera Avx Components |
WIRE TO BOARD
| Lead Time: 9-12Days | -- -- | 6200 | Total:
$
| |
TMM-104-06-TM-S-SM-TR
| Samtec |
2MM TERMINAL STRIP
| MPQ: 475 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
TMM-104-06-T-S-SM-TR
| Samtec |
2MM TERMINAL STRIP
| MPQ: 475 Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
TSM-105-01-TM-SV-TR
| Samtec |
CONN HEADER SMD 5POS 2.54MM
| MPQ: 350 Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
TSM-105-01-T-SV-TR
| Samtec |
CONN HEADER SMD 5POS 2.54MM
| MPQ: 350 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
FTR-103-02-T-D-TR
| Samtec |
CONN HEADER SMD 6POS 1.27MM
| MPQ: 525 Lead Time: 9-12Days | -- -- | 200 | Total:
$
| |
DF5A-7P-5DSA(35)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 7POS 5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
DF22L-1P-7.92DSA(05)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 1POS
| Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
DF1-13P-2.5DSA(05)
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 13POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 1500 | Total:
$
|