Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ACNW3410-500E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 8SMD GW

MPQ: 750

Lead Time: 9-12Days

-- --
7700
Total: $
ACNU-3410-500E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 8SO

MPQ: 1000

Lead Time: 9-12Days

-- --
4000
Total: $
HCPL-314J
Broadcom(Avago)
OPTOISO 5KV 2CH GATE DVR 16SO

MPQ: 45

Lead Time: 9-12Days

-- --
2900
Total: $
TMM-105-01-TM-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 750

Lead Time: 9-12Days

-- --
9000
Total: $
HCPL-3180-500
Broadcom(Avago)
OPTOISO 3.75KV 1CH GT DVR 8DIP

MPQ: 1000

Lead Time: 9-12Days

-- --
7800
Total: $
TMM-105-01-T-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 750

Lead Time: 9-12Days

-- --
6000
Total: $
HCPL-314J#500
Broadcom(Avago)
OPTOISO 5KV 2CH GATE DVR 16SO

MPQ: 850

Lead Time: 9-12Days

-- --
2500
Total: $
TMM-103-05-L-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 1050

Lead Time: 9-12Days

-- --
7400
Total: $
TMM-103-04-L-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 975

Lead Time: 9-12Days

-- --
7300
Total: $
HCPL-3180-560
Broadcom(Avago)
OPTOISO 3.75KV 1CH GT DVR 8DIP

MPQ: 1000

Lead Time: 9-12Days

-- --
6700
Total: $
TMM-103-01-LM-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 750

Lead Time: 9-12Days

-- --
7800
Total: $
TMM-103-01-L-S-SM-TR
Samtec
2MM TERMINAL STRIP

MPQ: 750

Lead Time: 9-12Days

-- --
8700
Total: $
ACPL-K33T-060E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 8SO

MPQ: 80

Lead Time: 9-12Days

-- --
2100
Total: $
TSM-103-04-L-SH-TR
Samtec
CONN HEADER SMD R/A 3POS 2.54MM

MPQ: 125

Lead Time: 9-12Days

-- --
1900
Total: $
ACNU-3410-000E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 8SO

MPQ: 80

Lead Time: 9-12Days

-- --
2300
Total: $
B16B-PH-KL(LF)(SN)
J.S.T.Mfg.Co.,Ltd.
CONN HEADER VERT16POS 2MM

MPQ: 250

Lead Time: 9-12Days

-- --
9600
Total: $
ADUM1234BRWZ-RL
Analog Devices
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

MPQ: 1000

Lead Time: 9-12Days

-- --
4800
Total: $
A4B-10PA-2DSA(51)
Hirose Electric Co.,Ltd.
CONN HEADER

MPQ: 100

Lead Time: 9-12Days

-- --
4000
Total: $
SI8231AD-D-IS
Skyworks
DGTL ISO 5KV 2CH GATE DVR 16SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
4000
Total: $
A4B-10PA-2DS(51)
Hirose Electric Co.,Ltd.
CONN HEADER

MPQ: 100

Lead Time: 9-12Days

-- --
5100
Total: $
  • 1
  • 2498
  • 2499
  • 2500
  • 2501
  • 2502
  • 6670
Go to