Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E31812JFM2B0
Vishay
CAP FILM 0.018UF 5% 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
1000
Total: $
V8508F
Assmann Wsw Components
HEATSINK ALUM WITH PIN TO-220

MPQ: 500

Lead Time: 9-12Days

-- --
4000
Total: $
PDTC114TEF,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.1A SC89

MPQ: 4000

Lead Time: 9-12Days

-- --
9900
Total: $
TSM-103-02-L-SH-TR
Samtec
CONN HEADER SMD R/A 3POS 2.54MM

MPQ: 425

Lead Time: 9-12Days

-- --
8000
Total: $
SI8235AB-D-IS1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

MPQ: 48

Lead Time: 9-12Days

-- --
4600
Total: $
MKP385E31812JFP2B0
Vishay
CAP FILM 0.018UF 5% 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
1800
Total: $
PDTC114YEF,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.1A SC89

MPQ: 4000

Lead Time: 9-12Days

-- --
9400
Total: $
272-AB
Wakefield-Vette
HEATSINK TO-220 SM FOOTPRINT BLK

MPQ: 1250

Lead Time: 9-12Days

-- --
7100
Total: $
PDTC115EEF,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V SC89

MPQ: 4000

Lead Time: 9-12Days

-- --
3100
Total: $
MKP385E41563KII2B0
Vishay
CAP FILM 0.15UF 10% 630VDC RAD

MPQ: 250

Lead Time: 9-12Days

-- --
400
Total: $
ISO5852SDWR
Texas Instruments
DGTL ISO 5.7KV 1CH GT DVR 16SOIC

MPQ: 2000

Lead Time: 9-12Days

-- --
2600
Total: $
V5640A-T
Assmann Wsw Components
HEATSINK ALUM ANOD

MPQ: 160

Lead Time: 9-12Days

-- --
8900
Total: $
V2008B
Assmann Wsw Components
HEATSINK BLK ALUM TO-220 DUAL

MPQ: 750

Lead Time: 9-12Days

-- --
1600
Total: $
PDTC115TK,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.1A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
8200
Total: $
1-2029059-0
Te Connectivity
CONN HEADER VERT 10POS 4.2MM

MPQ: 525

Lead Time: 9-12Days

-- --
7500
Total: $
F340Y231230JF02W0
Vishay
CAP FILM 0.012UF 5% 1KVDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
8300
Total: $
V8508C
Assmann Wsw Components
HEAT SINK ANOD ALUM TO-220

MPQ: 400

Lead Time: 9-12Days

-- --
1600
Total: $
PDTC123EEF,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.1A SC89

MPQ: 4000

Lead Time: 9-12Days

-- --
8800
Total: $
MKP385E38240JFI2B0
Vishay
CAP FILM 0.08UF 5% 400VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
5600
Total: $
IL-WX-6P-HF-B-E1000E
Jae
CONN HEADER SMD R/A 6POS 0.8MM

MPQ: 1000

Lead Time: 9-12Days

-- --
8000
Total: $
  • 1
  • 2349
  • 2350
  • 2351
  • 2352
  • 2353
  • 6670
Go to