Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
---|---|---|---|---|---|---|---|
ZW-14-12-G-D-603-210
| Samtec |
CONN BRD STACK .100" 28POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
9L28064 008H100
| Belden |
CBL RIBN 64COND 0.05 GRAY
| MPQ: 100 Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
ZW-14-12-G-D-640-195
| Samtec |
CONN BRD STACK .100" 28POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
3530 MC005
| Alpha Electronics(Vishay) |
CBL RIBN 10COND 0.052 MULT 100'
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
ZW-14-12-G-D-643-280
| Samtec |
CONN BRD STACK .100" 28POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
TW-14-02-L-D-170-SM-P-TR
| Samtec |
CONN HDR 28POS 0.079 STACK SMD
| MPQ: 150 Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
HF625/30-100M
| 3M |
CABLE RIBN 30COND 0.039 GRAY
| MPQ: 100 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
ZW-20-09-L-D-400-110
| Samtec |
CONN BRD STACK .100" 40POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
ZW-15-11-G-D-295-235
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
ZW-15-11-G-D-370-280
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
ZW-15-11-G-D-415-310
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
ZW-15-11-G-D-420-255
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
ZW-15-11-G-D-433-108
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
ZW-15-11-G-D-433-180
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
ZW-15-11-G-D-500-305
| Samtec |
CONN BRD STACK .100" 30POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
ZW-12-10-S-D-375-300
| Samtec |
CONN BRD STACK .100" 24POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
AWG28-64/F/300
| Assmann Wsw Components |
CBL RIBN 64COND 0.05 MULT
| MPQ: 300 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
ZW-12-10-S-D-410-210
| Samtec |
CONN BRD STACK .100" 24POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
ZW-12-10-S-D-500-220
| Samtec |
CONN BRD STACK .100" 24POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
ZW-12-10-S-D-540-090
| Samtec |
CONN BRD STACK .100" 24POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
|