Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
---|---|---|---|---|---|---|---|
1300980087
| Molex |
CABLE GRP 12.7-14.28MM 1/2"NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
1300980067
| Molex |
CABLE GRIP 6.35-11.1MM 1/2" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
1300980045
| Molex |
CABLE GRP RA 3.18-4.75MM 1/2"NPT
| MPQ: 25 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
0874381143
| Molex |
CONN HEADER SMD R/A 11POS 1.5MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
1300980097
| Molex |
CABLE GRIP 11.1-14.28MM 3/4" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
1300980009
| Molex |
MAX-LOC F2 1/2IN (.062-.125) WIT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
1300980115
| Molex |
CABLE GRP 14.28-17.45MM 3/4"NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
1300980122
| Molex |
CABLE GRP 15.88-19.05MM 3/4"NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
1300980216
| Molex |
CABLE GRP 4.75-6.35MM 3/4NPT PBT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
1300980195
| Molex |
CABLE GRIP 5.72MM 1/2" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
1300980197
| Molex |
CABLE GRIP 6.35MM 1/2" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
1300980199
| Molex |
CABLE GRIP 7.37MM 1/2" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
1300980139
| Molex |
CABLE GRIP 14.28-17.45MM 1" NPT
| MPQ: 10 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
1300980002
| Molex |
CABLE GRIP 3.18-11.1MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
1300980100
| Molex |
CABLE GRP 11.1-14.28MM 3/4"NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
1300980108
| Molex |
CABLE GRP 12.7-15.88MM 3/4"NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
1300980222
| Molex |
CABLE GRP 6.35-9.53MM 3/4NPT PBT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
1300980136
| Molex |
CABLE GRIP 12.7-15.88MM 1" NPT
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
1300980132
| Molex |
CABLE GRIP 11.1-14.28MM 1" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
1300980194
| Molex |
CABLE GRIP 4.83MM 1/2" NPT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
|