Amphenol
Profile:
Founded in 1932, Amphenol Corporation is headquartered in Wallingford, Connecticut, USA. The company's name is a hybrid of its original name, American Phenolic Corp. Amphenol has a rich history in the precision interface connection field, with expertise in areas such as SIM card connectors, SD card connectors, USB connectors, HDMI connectors, and RF conversions. Over the years, the company has expanded its product portfolio through acquisitions of connector manufacturers in different fields, entering traditional connector markets such as automotive, communications, industrial, and aerospace.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
863027BLF
Amphenol
DSUB HOOD POTING

MPQ: 1000

Lead Time: 9-12Days

-- --
1500
Total: $
CAP-DD1MDPC2
Amphenol
DUST CAP FOR D-SUB

MPQ: 10

Lead Time: 9-12Days

-- --
5600
Total: $
CAP-DD1FDPC1
Amphenol
DUST CAP FOR D-SUB

MPQ: 10

Lead Time: 9-12Days

-- --
4400
Total: $
CAP-DD1FDPC2
Amphenol
DUST CAP FOR D-SUB

MPQ: 10

Lead Time: 9-12Days

-- --
6900
Total: $
L17D8G45041
Amphenol
D SUB ACCESSORY

Lead Time: 9-12Days

-- --
1300
Total: $
98424-G52-08ALF
Amphenol
CONN HEADER SMD 8POS 2MM

Lead Time: 9-12Days

-- --
9400
Total: $
86552099LF
Amphenol
DSUB MALE LEVER LOCK

Lead Time: 9-12Days

-- --
3000
Total: $
L17D512241
Amphenol
D SUB SLIDE LOCK ASSBLY

Lead Time: 9-12Days

-- --
300
Total: $
CAP-DD2MDMA1
Amphenol
DUST CAP FOR D-SUB KSS HR-15M

MPQ: 10

Lead Time: 9-12Days

-- --
1900
Total: $
CAP-DD3MDMA1
Amphenol
DUST CAP FOR D-SUB KSS HR-25M

MPQ: 10

Lead Time: 9-12Days

-- --
1500
Total: $
CAP-DD3FDMA1
Amphenol
DUST CAP FOR D-SUB KSS HR-25F

MPQ: 10

Lead Time: 9-12Days

-- --
5600
Total: $
86553152TLF
Amphenol
DSUB METAL CAP

Lead Time: 9-12Days

-- --
8200
Total: $
86553151TLF
Amphenol
DSUB METAL CAP

Lead Time: 9-12Days

-- --
4400
Total: $
L17D4K63050
Amphenol
METAL D SUB DUST COVER

Lead Time: 9-12Days

-- --
6500
Total: $
863034252LF
Amphenol
DSUB F LVRLOCK ASY 09-37

Lead Time: 9-12Days

-- --
8900
Total: $
L17D512211
Amphenol
D SUB SLIDE LOCK ASSBLY

Lead Time: 9-12Days

-- --
8400
Total: $
L17D4K63115
Amphenol
METAL D SUB DUST COVER

MPQ: 100

Lead Time: 9-12Days

-- --
7900
Total: $
86553116TLF
Amphenol
DSUB METAL CAP

Lead Time: 9-12Days

-- --
6700
Total: $
L17D512231
Amphenol
D SUB SLIDE LOCK ASSBLY

Lead Time: 9-12Days

-- --
2500
Total: $
L17D4K63137
Amphenol
METAL D SUB DUST COVER

Lead Time: 9-12Days

-- --
9600
Total: $
  • 1
  • 281
  • 282
  • 283
  • 284
  • 285
  • 3626
Go to