Amphenol
Profile:
Founded in 1932, Amphenol Corporation is headquartered in Wallingford, Connecticut, USA. The company's name is a hybrid of its original name, American Phenolic Corp. Amphenol has a rich history in the precision interface connection field, with expertise in areas such as SIM card connectors, SD card connectors, USB connectors, HDMI connectors, and RF conversions. Over the years, the company has expanded its product portfolio through acquisitions of connector manufacturers in different fields, entering traditional connector markets such as automotive, communications, industrial, and aerospace.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
98424-F52-06ALF
Amphenol
CONN HEADER SMD 6POS 2MM

Lead Time: 9-12Days

-- --
7800
Total: $
98424-F52-08ALF
Amphenol
CONN HEADER SMD 8POS 2MM

Lead Time: 9-12Days

-- --
5900
Total: $
LMS-01T-TL
Amphenol
SPLICE HOUSING 1 BAY

MPQ: 1

Lead Time: 9-12Days

-- --
7900
Total: $
10037910-101LF
Amphenol
10.8MM GUIDE PIN EXT THR

Lead Time: 9-12Days

-- --
6900
Total: $
10037911-103LF
Amphenol
10.8MM GUIDE PIN INT THR

Lead Time: 9-12Days

-- --
9100
Total: $
10037912-101LF
Amphenol
CONN ACCY 10.7MM GUIDE MOD R/A

Lead Time: 9-12Days

-- --
1600
Total: $
10138462-101LF
Amphenol
OCTIS PLUG KIT 3 POSN POWER

Lead Time: 9-12Days

-- --
1900
Total: $
91289-101LF
Amphenol
CONN ACCY CODING KEY BLUE

Lead Time: 9-12Days

-- --
2800
Total: $
10037908-101LF
Amphenol
CONN ACCY 7.2MM GUIDE BLADE EXT

Lead Time: 9-12Days

-- --
7300
Total: $
10044366-101LF
Amphenol
GUIDEPIN AIRMAX 10.8MM R/A

Lead Time: 9-12Days

-- --
3200
Total: $
10037911-102LF
Amphenol
10.8MM GUIDE PIN INT THR

Lead Time: 9-12Days

-- --
8400
Total: $
10044314-101LF
Amphenol
CONN ACCY 7.2MM GUIDE BLADE CO

Lead Time: 9-12Days

-- --
9600
Total: $
10045367-101LF
Amphenol
CONN ACCY 7.2MM GUIDE SOCKET

Lead Time: 9-12Days

-- --
6300
Total: $
10037912-104LF
Amphenol
10.8MM GUIDE MODULE ASSY

Lead Time: 9-12Days

-- --
8600
Total: $
65182-001LF
Amphenol
BP LATCH LF

Lead Time: 9-12Days

-- --
7200
Total: $
91289-102LF
Amphenol
MALE HALF KEY

Lead Time: 9-12Days

-- --
1500
Total: $
65188-001LF
Amphenol
CONN FRAME LOCKING 96POS TRI ROW

Lead Time: 9-12Days

-- --
8900
Total: $
HM2DK3456PLF
Amphenol
HM2DK3456PLF MPAC DISCR KEY PLUG

Lead Time: 9-12Days

-- --
5900
Total: $
65155-001LF
Amphenol
BP UNIVERSAL COVER LF

Lead Time: 9-12Days

-- --
7800
Total: $
88917-201LF
Amphenol
GUIDE RECEP MOD PRESS PE-G 12MM

Lead Time: 9-12Days

-- --
800
Total: $
  • 1
  • 251
  • 252
  • 253
  • 254
  • 255
  • 3626
Go to