
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SMCJ33CA
| Dowo |
TVS SMC Ppp=1.5KW VC=53.3V Ipp=28.14A VRWM=33V
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
SM8S36A
| Dowo |
ESD/TVS 36V 114A 6.6KW DO218AB
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
STFU10NK60Z
| Stmicroelectronics |
MOSFET 35W 600V 10A 1N TO-220FP
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
STTH8L06G-TR
| Stmicroelectronics |
STTH8L06G-TR D2PAK
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
TPS259472ARPWR
| Texas Instruments |
2.7-V TO 23-V, 28-M, 5.5-A EFUSE
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
B32021A3222K000
| Tdk |
Y2 ±10% 2.2nF 300V ,P=10mm
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
MUR1540G
| Onsemi |
Rectifier Diode Switching 400V 15A 60ns 2-Pin(2+Tab) TO-220AC
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
BVSS123LT1G
| Onsemi |
MOSFET 225mW 100V 170mA 1N SOT-23
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
S115FP
| Onsemi |
--150V-1A--SOD-123HE
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
PESD5V0L2BT
| Dowo | Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| ||
BC857BE6327
| Infineon |
Transistor: PNP; bipolar; 45V; 0.1A; 0.33W; SOT23
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
LMR23630AFDDAR
| Texas Instruments |
DC-DC 4V~36V 1V~28V SO-8
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
TL432BQDBZRQ1
| Texas Instruments |
100mA ±0.5% 2.495V~36V SOT-23-3
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
KSA992FTA
| Onsemi |
ON Semiconductor, KSA992FTA
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
FRG0603F2005TS
| Fojan |
100mW 20MΩ ±1%
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
142KD14-F
| Yageo |
14mm 1.4kV
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
1-1827876-2
| Te Connectivity | Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| ||
1-1827864-6
| Te Connectivity |
TE DYNAMIC 1200D REC HSG 12P X BLACK
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
SMAJ48A
| Goodwork | Lead Time: 9-12Days | -- -- | 900 | Total:
$
| ||
1888247-2
| Te Connectivity |
SFP, SFP+ & zSFP+, Connector, Data Rate (Max) 16 Gb/s, SFP, Not Optional, Surface Mount, Cable-to-Board, 20 Position, .031 in [.8 mm]
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
|