Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
RS724XQ
Runic
7V/us 1pA 10MHz

Lead Time: 9-12Days

-- --
9500
Total: $
RS0102YUTDS8
Runic
/ RS0102YUTDS8 DFN-8L1x1.4

Lead Time: 9-12Days

-- --
3100
Total: $
RS2257XH
Runic
/

Lead Time: 9-12Days

-- --
8700
Total: $
DTC114EE
Twgmc

Lead Time: 9-12Days

-- --
7300
Total: $
LSI1012XT1G
Lrc
MOSFET 250mW 20V 500mA 1N

Lead Time: 9-12Days

-- --
4900
Total: $
SS8050
Jingdao
BJT 300mW 25V 1.5A NPN

Lead Time: 9-12Days

-- --
3500
Total: $
TPPESD5V0S1BB
Tech Public
TVS/ESD TPPESD5V0S1BB

Lead Time: 9-12Days

-- --
6700
Total: $
TPS2061DR
Texas Instruments
1A 70mΩ 2.7V~5.5V

Lead Time: 9-12Days

-- --
700
Total: $
TPS65261-1RHBR
Texas Instruments
DC-DC 4.5V~18V 600mV~18V

Lead Time: 9-12Days

-- --
2100
Total: $
SL2.2S
Corechips

Lead Time: 9-12Days

-- --
7700
Total: $
SY50213WFAC
Silergy
AC-DC SY50213WFAC

Lead Time: 9-12Days

-- --
2300
Total: $
PZ2012D800-3R0TF
Sunlord
80Ω@100MHz 40mΩ ±25% 3A

Lead Time: 9-12Days

-- --
5500
Total: $
19-237/R6G7Y5C-A01/2T
Everlight
/LED 19-237/R6G7Y5C-A01/2T

Lead Time: 9-12Days

-- --
4300
Total: $
26-21/BHC-ATW/CT
Everlight
/LED 26-21/BHC-ATW/CT

Lead Time: 9-12Days

-- --
3900
Total: $
27-21/T1D-AP2R1HY/3C
Everlight
27-21/T1D-AP2R1HY/3C

Lead Time: 9-12Days

-- --
8300
Total: $
24C02A(LX)
Lx
EEPROM 24C02A(LX) SOP-8

Lead Time: 9-12Days

-- --
8500
Total: $
CYPC817(B-TP2)
Ocic
CYPC817B-TP2 SOP-4

Lead Time: 9-12Days

-- --
2300
Total: $
CYPC817(C-TP2)
Ocic
CYPC817C-TP2 SOP-4

Lead Time: 9-12Days

-- --
2900
Total: $
LGSOT05CLT1G
Lrc
ESD

Lead Time: 9-12Days

-- --
3700
Total: $
LBZT52B16T1G
Lrc
16V 15.85V~16.51V 100nA

Lead Time: 9-12Days

-- --
1300
Total: $
  • 1
  • 921
  • 922
  • 923
  • 924
  • 925
  • 6854
Go to