
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
1N5819W
| Slkor |
SOD-123
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
AMS1117-ADJ
| Slkor |
:Adjustable :30V :1A /:1.25V
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
BAT54S
| Slkor |
1V@100mA 30V 200mA
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
BSMD2920-400-24V
| Bhfuse |
BSMD2920-400-24V 2920
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
BSMD0603-050-12V
| Bhfuse |
12V 500mA
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
BCP56-16
| Slkor |
BJT 1.5W 80V 1A NPN
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
BC847B
| Slkor |
BJT 300mW 45V 100mA NPN
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
BZT52C16
| Shikues |
16V 15.3V~17.1V 100nA@12V
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
BZT52C16Q
| Yangjie | Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| ||
BT138S-800E
| Fuxinsemi |
/ 30mA 800V 1.3V
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
ES2D
| Slkor |
/ 950mV@2A 200V 5uA@200V 2A
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
LM2576S-5.0
| Slkor |
DC-DC
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
LM2596S-ADJ
| Slkor |
DC-DC 3A 4.5V~40V 1.193V~1.267V
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
LESD5D5.0CT1G
| Umw | Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| ||
LBAT54AWT1G
| Lrc |
400mV 30V 2uA 200mA
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
LBSS260DW1T1G
| Lrc |
MOSFET 380mW 60V 200mA 1N
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
LESD8D3.3CAT5G
| Fuxinsemi | Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| ||
ME6231C18M5G
| Microne |
ME6231C18M5G
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
MMDT3904
| Fuxinsemi |
BJT 200mW 40V 200mA NPN
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
RCLAMP0502B
| Slkor |
TVS/ESD RCLAMP0502B SOT523
| Lead Time: 9-12Days | -- -- | 3300 | Total:
$
|