
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
FXL0518-3R3-M
| Cjiang |
5A 3.3uH ±20% 4.5A SMD,5.2x5.4mm
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
FNR3015S6R8MT
| Cjiang |
1.1A 6.8uH ±20% 1.1A SMD,3x3mm
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
FNR5040S103MT
| Cjiang |
75mA 10mH ±20% 86mA SMD,5x5mm
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
FNR5040S120MT
| Cjiang |
2.5A 12uH ±20% 2.1A SMD,5x5mm
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
FNR8040S330MT
| Cjiang |
2.4A 33uH ±20% 2A SMD,8x8mm
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
FHD252010S-R47MT
| Cjiang |
5.2A 470nH ±20% 3.6A SMD,2.5x2x1mm
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
FXL0840-6R8-M
| Cjiang |
9A 6.8uH ±20% 8A SMD,8.8x8.2mm
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
FXL1050-4R7-M
| Cjiang |
15A 4.7uH ±20% 11A SMD,10x11.5mm
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
FXL0840-220-M
| Cjiang |
5A 22uH ±20% 4.8A SMD,8.2x8.8mm
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
FAUL1050-6R8MT
| Cjiang |
14A 6.8uH ±20% 9A SMD,11.5x10mm
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
FXL0840-100-M
| Cjiang |
8A 10uH ±20% 6.5A SMD,8.2x8.8mm
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
TDA2030A
| Jsmicro Semiconductor | Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| ||
SMAJ15CA
| Tech Public | Lead Time: 9-12Days | -- -- | 300 | Total:
$
| ||
BSS84AK,215(ES)
| Elecsuper | Lead Time: 9-12Days | -- -- | 700 | Total:
$
| ||
PESD1CAN-UX
| Tech Public |
PESD1CAN-UX-TP
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
4532-351-LF
| Yageo |
GDT 4532-351-LF SMD,4.5x3.2mm
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
RLSD32A051V
| Ruilon |
!
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
BFC233860223
| Vishay |
Y2 -55℃~+105℃ 300V
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
BSS84
| Tech Public | Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| ||
5.0SMDJ64CA/TR13
| Yageo |
TVS 5.0SMDJ64CA/TR13 64V SMCDO-214AB
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
|