
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
FXL0530-1R5-M
| Cjiang |
8.5A 1.5uH ±20% 8.2A SMD,5.2x5.4mm
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
FDCW2012-2-121TF
| Cjiang |
120Ω@100MHz 50V 400mA 0805
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
FNR6045S103KT
| Cjiang |
120mA 10mH ±10% 100mA SMD,6x6mm
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
FAUL0630-100MT
| Cjiang |
5.5A 10uH ±20% 4.5A SMD,6.6x7mm
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
FNR6045S6R8MT
| Cjiang |
4.3A 6.8uH ±20% 3.3A SMD,6x6mm
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
FNR6045S152MT
| Cjiang |
270mA 1.5mH ±20% 240mA SMD,6x6mm
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
1N4745A-G_AY_10001
| Panjit |
16V 15.2V~16.8V 100nA@12.2V DO-41G
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
FAUL0630-470MT
| Cjiang |
2A 47uH ±20% 1.5A SMD,6.6x7mm
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
FXL0518-4R7-M
| Cjiang |
4A 4.7uH ±20% 3.5A SMD,5.2x5.4mm
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
FNR4020S1R5MT
| Cjiang |
4.9A 1.5uH ±20% 3A SMD,4x4mm
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
TX1812MWCA5-F01
| Tcwin | Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| ||
UF3D_R1_00001
| Panjit |
1V@3A 200V 3A SMCDO-214AB
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
FAUL0754-680MT
| Cjiang | Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| ||
GS1G_R1_00001
| Panjit |
1.1V@1A 400V 1A SMADO-214AC
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
FNR4018S6R8MT
| Cjiang |
2A 6.8uH ±20% 1.5A SMD,4x4mm
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
FTW1608FE4R7KT
| Cjiang |
400mA 4.7uH ±10% 420mA 0603
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
FXL0420-1R2-M
| Cjiang |
7A 1.2uH ±20% 6A SMD,4.2x4.4mm
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
FHD3020S-3R3MT
| Cjiang |
5.5A 3.3uH ±20% 3A SMD,3x3mm
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
FNR6045S120MT
| Cjiang |
3A 12uH ±20% 2.4A SMD,6x6mm
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
FNR6045S820MT
| Cjiang |
1.1A 82uH ±20% 990mA SMD,6x6mm
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
|