
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MMBT5551
| Umw |
BJT 300mW 160V 600mA NPN
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
SMF28A
| Slkor |
TVS/ESD SMF28A SOD-123FL
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
SMCJ60A-E3/57T
| Vishay |
Diode: TVS; 1.5kW; 70.2V; 15.5A; unidirectional; SMC;
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
PCF8574DWR
| Umw | Lead Time: 9-12Days | -- -- | 500 | Total:
$
| ||
SN74LVC1G17DBVR
| Umw | Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| ||
SN74LVC1G66DCKR
| Umw |
IC
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
TCA9535PWR
| Umw |
USBI/O
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
AO4409
| Umw |
SOP-8
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
LM2902
| Slkor |
80dB 0.4V/us 1.3MHz
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
SGM8273-1XS8G/TR
| Sgmicro |
SGM8273-1XS8G/TR
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
TS5A63157DCKR
| Texas Instruments |
/ TS5A63157DCKR
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
CD4013
| Slkor |
CD4013
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MHT195URUGCT
| Meihua |
0603
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
MHK2396GEBTD
| Meihua |
/LED MHK2396GEBTD LED_9X4.3MM_TM
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
MHT193UGCT
| Meihua |
/LED MHT193UGCT 0603
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
MHT192WDT-CYAN
| Meihua |
/LED MHT192WDT-CYAN 0603
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
MHS171CRCT
| Meihua |
/LED MHS171CRCT 0805
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
MHT194CRGBCT
| Meihua |
RGBLED MHT194CRGBCT LED_1.6X1.5MM_SM
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MHL5013UBDWT
| Meihua |
/LED MHL5013UBDWT LED_D5X8.6MM_TM
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
MHT153IRCT
| Meihua |
1206IR940nm30°
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
|