
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MHLA5319URGBDWT
| Meihua |
RGBLED MHLA5319URGBDWT LED_D4.9X8.7MM_TM
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
MHLA3029RBTS
| Meihua | Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| ||
MHT136WDT-C2
| Meihua |
/LED MHT136WDT-C2 0402
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
STD20NF06L
| Umw |
MOSFET 55W 60V 30A 1N
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
MHK2512RGTD
| Meihua |
,/ LEDhousingLED
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
FDN338P
| Umw |
MOSFET 400mW 20V 2.8A 1P
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
LM339
| Jscj |
2V~36V
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
LM317LD
| Umw |
LDO 40V 100mA 1.2V~37V
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
LP5907MFX-3.3/NOPB(MS)
| Msksemi | Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| ||
MTLP521-1GB(DIP)
| Msksemi | Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| ||
MTLP521-1GB(SOP)
| Msksemi | Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| ||
AO4884
| Umw |
MOSFET AO4884
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
CD4017BM-MS
| Msksemi | Lead Time: 9-12Days | -- -- | 700 | Total:
$
| ||
DS18B20-MS
| Msksemi | Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| ||
GJM1555C1HR20WB01D
| Murata |
MLCC 50V 0.2pF C0G
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
IRF4905
| Umw |
MOSFET P-CH 55V 74A
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
IR2110STR
| Umw | Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| ||
LM2675M-5.0
| Umw |
IC 5V 1 1A 8-SOIC0.154",3.90mm
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
MHLC3029UEGTD
| Meihua |
/LED MHLC3029UEGTD LED_D3.85X5.3MM_TM
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
OPA333AIDBVR
| Umw | Lead Time: 9-12Days | -- -- | 1300 | Total:
$
|