
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
GRM033C71C104KE14D
| Murata |
MLCC 16V ±10% 100nF X7S
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
GRM0335C1H471JE01D
| Murata |
Capacitor: ceramic; MLCC; 470pF; 50V; C0G (NP0); ±5%; SMD;
| Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
IRLML2502
| Hottech Semiconductor |
MOSFET 20V 4.2A 1N
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
LM2575HVS-5.0
| Umw |
IC REG BUCK 5.0V 2A
| Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
LL4150GS08
| Vishay |
1V@200mA 50V 100nA@50V 300mA
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
LL46-GS08
| Vishay |
1V@250mA 100V 5uA@75V 150mA
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
M4
| Bourns Inc. |
1.1V@1A 400V 5uA@400V 1A
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
OT705010MJBA4SL
| Yxc |
CMOS 10MHz ±10ppm 1.8V~3.3V
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
OT503212MJBA4SL
| Yxc |
CMOS 12MHz ±10ppm 1.8V~3.3V
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
NTD3528I3
| Nationstar | Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| ||
SMBJ5.0A-E3/5B
| Vishay |
Diode: TVS; 600W; 6735mV; 65.2A; unidirectional; SMB;
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
S8205A
| Hottech Semiconductor |
MOSFET 1.25W 20V 5A 2N
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
S9013
| Hottech Semiconductor |
BJT 300mW 25V 500mA NPN
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
S9015
| Hottech Semiconductor |
BJT 200mW 45V 100mA PNP
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
SS10100
| Bourns Inc. |
100V 10A
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
X49SD27MSD2SC
| Yxc |
27MHz 20pF ±20ppm
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
ZMM15
| Hottech Semiconductor |
13.8V~15.6V 500mW 100nA@11V
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
LTV-480P-TA1-H
| Liteon |
4.5V~30V DC 20kV/us 5kV
| Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
NTD3528R3
| Nationstar | Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| ||
NSV40200LT1G
| Onsemi |
BJT 460mW 40V 2A PNP
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
|