
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
BZT52C3V3S
| Twgmc |
3.3V 3.1V~3.5V 5uA@1V
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
DSK24
| Twgmc |
550mV@2A 40V 2A
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
LBZT52B15T1G
| Lrc |
15V 14.34V~14.98V 100nA
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
M520
| Dowo |
1.2V@1A 2kV 1A
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
MMUN2211
| Cbi |
MMUN2211 11
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
RB520S-30
| Twgmc |
600mV@200mA 30V 200mA
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
RL30-500
| Ruilon |
/Fuse 30V 5A
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
SMAJ24CA
| Twgmc |
TVS/ESD SMAJ24CA SMADO-214AC
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
SMAJ12CA
| Twgmc |
TVS/ESD SMAJ12CA SMADO-214AC
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
SS56
| Dowo |
700mV@5A 60V 500uA@60V 5A
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
S8550
| Cbi |
BJT 200mW 25V 500mA PNP
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
SS8550
| Cbi |
BJT 300mW 25V 1.5A PNP
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
SS54F
| Twgmc |
SMAF
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
XL13700
| Xinluda | Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| ||
XD74LS21
| Xinluda | Lead Time: 9-12Days | -- -- | 700 | Total:
$
| ||
XD74LS147
| Xinluda | Lead Time: 9-12Days | -- -- | 900 | Total:
$
| ||
XD74LS02
| Xinluda | Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| ||
SMF6.0CA
| Twgmc |
ESD/TVS SOD123FL 10.3V 19.4A
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
TP1962-SR
| 3Peak |
7ns, 1/2/4, Ultra-High-Speed, +3V/+5V, Beyond-the-Rails Comparators
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
US2M
| Twgmc |
SMA
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
|