
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
2N2222AU
| Cbi | Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| ||
1N5824
| Dowo | Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| ||
271KD10
| Yageo |
10mm 270V
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
AM2394NE-VB
| Vbsemi |
MOS AM2394NE-VB
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
B540C
| Dowo | Lead Time: 9-12Days | -- -- | 100 | Total:
$
| ||
BSS308PE-VB
| Vbsemi |
MOS BSS308PE-VB
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
BS170FTA-VB
| Vbsemi |
MOS BS170FTA-VB
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
BZT52C3V3S
| Twgmc |
3.3V 3.1V~3.5V 5uA@1V
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
DSK24
| Twgmc |
550mV@2A 40V 2A
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
LBZT52B15T1G
| Lrc |
15V 14.34V~14.98V 100nA
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
M520
| Dowo |
1.2V@1A 2kV 1A
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
MMUN2211
| Cbi |
MMUN2211 11
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
RB520S-30
| Twgmc |
600mV@200mA 30V 200mA
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
RL30-500
| Ruilon |
/Fuse 30V 5A
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
SMAJ24CA
| Twgmc |
TVS/ESD SMAJ24CA SMADO-214AC
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
SMAJ12CA
| Twgmc |
TVS/ESD SMAJ12CA SMADO-214AC
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
SS56
| Dowo |
700mV@5A 60V 500uA@60V 5A
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
S8550
| Cbi |
BJT 200mW 25V 500mA PNP
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
SS8550
| Cbi |
BJT 300mW 25V 1.5A PNP
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
SS54F
| Twgmc |
SMAF
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
|