Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
WD1042E-5/TR
Omnivision
DC-DC WD1042E-5/TR

Lead Time: 9-12Days

-- --
5500
Total: $
SGM4717EP-YWQ10/TR
Sgmicro
// SGM4717EP-YWQ10/TR

Lead Time: 9-12Days

-- --
6900
Total: $
SL54F
Mdd
450mV@5A 40V 5A

Lead Time: 9-12Days

-- --
1100
Total: $
BRCS035N03ZC
Blue Rocket

Lead Time: 9-12Days

-- --
3500
Total: $
0443.500DR
Littelfuse
Fuse Chip Slow Blow Acting 0.5A 250V SMD Solder Pad 10.1 X 3.12 X 3.12mm Ceramic T/R

Lead Time: 9-12Days

-- --
7700
Total: $
BZT52B15Q
Yangjie
15V 500mW 100nA@10.5V

Lead Time: 9-12Days

-- --
1100
Total: $
BL24C512A-NTRC
Shanghai Belling
EEPROM BL24C512A-NTRC

Lead Time: 9-12Days

-- --
2900
Total: $
MB10F-GKA
Goodwork
1V@0.5A 1kV 5uA@1000V 1A

Lead Time: 9-12Days

-- --
1700
Total: $
M24C08-WMN6P
Stmicroelectronics
EEPROM -40℃~+85℃ 8Kbit I2C 2.5V~5.5V

Lead Time: 9-12Days

-- --
9500
Total: $
P6KE15CA
Stmicroelectronics
Diode TVS Single Bi-Dir 13V 600W 2-Pin DO-15

Lead Time: 9-12Days

-- --
8700
Total: $
P6SMBJ30CA-AU_R1_000A1
Panjit
ESD/TVS 600W,Transient Voltage

Lead Time: 9-12Days

-- --
5700
Total: $
SB360_AY_10001
Panjit
750mV@3A 60V 3A

Lead Time: 9-12Days

-- --
8900
Total: $
SQ24301DSD
Silergy

Lead Time: 9-12Days

-- --
6900
Total: $
SS5U100
Yangjie
:100V :5A

Lead Time: 9-12Days

-- --
7500
Total: $
SM80592EIHD
Silergy
DC-DC SM80592EIHD

Lead Time: 9-12Days

-- --
2500
Total: $
SY98001RCC
Silergy
High Efficiency 3MHz, 1.2A Inductor Built-in Synchronous Step Down

Lead Time: 9-12Days

-- --
5900
Total: $
VN2450N8-G
Microchip
MOSFET N-CH 500V 250MA

Lead Time: 9-12Days

-- --
8500
Total: $
H7230-1
Siproin
LDO 15V 400mA 3V

Lead Time: 9-12Days

-- --
2700
Total: $
H7250-1
Siproin
LDO 15V 400mA 5V

Lead Time: 9-12Days

-- --
7900
Total: $
H7544-1
Siproin
LDO 15V 150mA 4.4V

Lead Time: 9-12Days

-- --
4300
Total: $
  • 1
  • 707
  • 708
  • 709
  • 710
  • 711
  • 6854
Go to