Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FXLB252012-2R2-M
Cjiang
3.3A 2.2uH ±20% 3A

Lead Time: 9-12Days

-- --
5300
Total: $
FXL1040-150-M
Cjiang
7A 15uH ±20% 6.5A

Lead Time: 9-12Days

-- --
5700
Total: $
FXL1040-330-M
Cjiang
5A 33uH ±20% 4.4A

Lead Time: 9-12Days

-- --
7100
Total: $
FXL0630-1R0-M
Cjiang
15A 1uH ±20% 12A

Lead Time: 9-12Days

-- --
4100
Total: $
G6RN-1 DC24
Omron
RELAY GEN PURPOSE SPDT 8A

Lead Time: 9-12Days

-- --
6700
Total: $
LBAT54CLT1G
Dowo

Lead Time: 9-12Days

-- --
4500
Total: $
TK10A60D(STA4,X,M)
Toshiba
MOSFET TK10A60DSTA4,X,M

Lead Time: 9-12Days

-- --
7900
Total: $
TJA1027T/20/1
Nxp Semiconductors
LIN TJA1027T/SO8//20/1/REEL 13 Q1/T1 *STANDARD MARK

Lead Time: 9-12Days

-- --
1100
Total: $
ABS10
Dowo
950mV@400mA 1kV 10uA@1kV 800mA

Lead Time: 9-12Days

-- --
1900
Total: $
HN1B04FE-GR,LF(B
Toshiba
HN1B04FE-GR,LF(B

Lead Time: 9-12Days

-- --
3500
Total: $
MFR3WSFTE73-100R
Yageo
3W 100Ω ±1%

Lead Time: 9-12Days

-- --
6500
Total: $
RC0805FR-07150RL
Yageo
RES SMD 150 OHM 1% 1/8W

Lead Time: 9-12Days

-- --
9500
Total: $
SMBJ400A
Dowo

Lead Time: 9-12Days

-- --
4100
Total: $
ZIRM-5042B-42-Z2
Chau Light

Lead Time: 9-12Days

-- --
8500
Total: $
ESD9B5.0ST5G
Dowo

Lead Time: 9-12Days

-- --
1100
Total: $
ESD5471X
Dowo

Lead Time: 9-12Days

-- --
700
Total: $
FNR3015S4R7MT
Cjiang
1.4A 4.7uH ±20% 1.3A

Lead Time: 9-12Days

-- --
2500
Total: $
FNR6045S680MT
Cjiang
1.3A 68uH ±20% 1.1A

Lead Time: 9-12Days

-- --
5500
Total: $
G5NB-1A-E DC24
Omron
RELAY GEN PURPOSE SPST 5A

Lead Time: 9-12Days

-- --
4700
Total: $
FTC252012S6R8MBCA
Cjiang
2A 6.8uH ±20% 1.6A

Lead Time: 9-12Days

-- --
2700
Total: $
  • 1
  • 669
  • 670
  • 671
  • 672
  • 673
  • 6854
Go to