
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
1SS362FV,L3F(T
| Toshiba |
1 970mV@100mA 80V 100mA
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
BAT54A
| Swst |
1V@100mA 30V 200mA
| Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
BZX84C12
| Swst |
12V 11.4V~12.7V 100nA@8V
| Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
CC0603JRNPO0BN101
| Yageo |
MLCC 100V ±5% 100pF NP0
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
HF115F/005-2ZS4AF
| Hongfa |
5V
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
HF161F-W/12-HT
| Hongfa |
HF161F-W/12-HT
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
MPXHZ6115A6T1
| Nxp Semiconductors |
SENSOR PRESSURE ABSOLUTE
| Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
P6KE200A
| Bourns Inc. |
TVS/ESD P6KE200A
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
RT8288AZSP
| Richtek |
DC-DC 4.5V~21V 808mV~15V
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
SS310A
| Swst |
850mV@3A 100V 3A
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
SS210
| Bourns Inc. |
850mV@1A 100V 2A
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
SVF23N50PN
| Silan |
MOSFET 280W 500V 23A 1N
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
SVF18N50PN
| Silan |
MOSFET 240W 500V 18A 1N
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
SGM8584XS14G/TR
| Sgmicro |
SGM8584XS14G/TR
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
SGT40N60FD1P7
| Silan | Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| ||
STTH30L06GY-TR
| Stmicroelectronics |
STTH30L06GY-TR
| Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
UDD32C12L01
| Yageo |
ESD
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
BSZ028N04LS
| Infineon |
MOSFET BSZ028N04LS
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
BSZ120P03NS3GATMA1
| Infineon |
MOSFET 2.1W;52W 30V 11A;40A 1P
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
BSS606NH6327
| Infineon |
MOSFET 1W 60V 3.2A 1N
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
|