
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
CC0603JRNPO9BN620
| Yageo |
MLCC 50V ±5% 62pF NP0
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
FNR3015S470MT
| Cjiang |
430mA 47uH ±20% 440mA
| Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
FNR4030S2R2MT
| Cjiang |
5.8A 2.2uH ±20% 3.2A
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
FNR4020S2R2MT
| Cjiang |
3.7A 2.2uH ±20% 2.8A
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
FHD4020S-470MT
| Cjiang |
1.3A 47uH ±20% 660mA
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
FHD4020S-220MT
| Cjiang |
1.5A 22uH ±20% 1.1A
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
FHD4020S-1R5MT
| Cjiang |
9.6A 1.5uH ±20% 6A
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
FC3356
|
FC3356
| Lead Time: 9-12Days | -- -- | 900 | Total:
$
| ||
FCR951
|
FCR951
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| ||
FDCW2012-2-102TF
| Cjiang |
1kΩ@100MHz 50V 100mA
| Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
PMR18EZPFV4L00
| Rohm Semiconductor |
/ 1W 4mΩ ±1%
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
TCLT1005
| Vishay |
50mA 5kV 1.25V
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
FXL1040-8R2-M
| Cjiang |
9A 8.2uH ±20% 8A
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
FXL0420-R47-M
| Cjiang |
9.5A 470nH ±20% 7.5A
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
TZMB22-GS08
| Vishay |
22V 500mW 100nA@16V 55Ω
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
79L05
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |||
2SC4213-B(TE85L,F)
| Toshiba |
BJT 100mW 20V 300mA NPN
| Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
CJ6206A38M
| Jscj | Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| ||
HT7533
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |||
BAT54C
| Blue Rocket |
SOT23 Vrrm=30V If=200mA Ifsm=600mA Pd=290mW Ct=10pF Trr=5ns
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
|