
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
5229911-3
| Te Connectivity |
SCREW, PAN HD, CAPTIVE
| Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
4-745130-4
| Te Connectivity |
SHLDING FERRULE,PLTD,BULK PKG
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
9-146258-0-08
| Te Connectivity |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
9-146280-0-08
| Te Connectivity |
CONN HEADER VERT 8POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
4-103322-0-08
| Te Connectivity |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
1339519-1
| Te Connectivity |
CONN BACKSHELL COVER 50POS 90DEG
| Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
5552561-8
| Te Connectivity |
CONN CHAMP BAIL LOCK KIT
| Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
9-103329-0-08
| Te Connectivity |
CONN HEADER R/A 8POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
443279-3
| Te Connectivity |
CONN STANDOFF BUSHING 4-40 2PCS
| Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
5747025-3
| Te Connectivity |
CONN D-SUB GASKET RFI 15POS TIN
| MPQ: 5000 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
569335-1
| Te Connectivity |
COVER KIT 90 DEG CHAMP SYS 5 2PC
| Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
5552562-2
| Te Connectivity |
KIT,HDW,BAIL LOCK,VERT MTG
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
2-745129-9
| Te Connectivity |
SHLDING FERRULE,PLTD,BULK PKG
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
745777-4
| Te Connectivity |
CONN D-SUB GASKET RFI 37POS TIN
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
745403-2
| Te Connectivity |
CONN LATCH BLOCK REAR DB9-37POS
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
1589284-2
| Te Connectivity |
331-0010-02 = HARDWARE
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
745547-2
| Te Connectivity |
CBL CLMP KIT SZ 1 3 PC PART
| MPQ: 400 Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
749996-1
| Te Connectivity |
CONN D-SUB LATCH SLIDE 25 POS
| MPQ: 1600 Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
2-747580-4
| Te Connectivity |
CONN FERRULE STEPPED DB37/50
| Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
2-1393561-7
| Te Connectivity |
D-SUB ACCS
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
|