Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ECW-H16273JVB
Panasonic
CAP FILM 0.027UF 5% 1.6KVDC RAD

Lead Time: 9-12Days

-- --
3600
Total: $
LC4128V-5TN144I
Lattice
IC CPLD 128MC 5NS 144TQFP

Lead Time: 9-12Days

-- --
300
Total: $
ECW-H16333JVB
Panasonic
CAP FILM 0.033UF 5% 1.6KVDC RAD

Lead Time: 9-12Days

-- --
7700
Total: $
XA2C256-8TQG144Q
Amd
IC CPLD 256MC 7NS 144TQFP

Lead Time: 9-12Days

-- --
6500
Total: $
ECW-H16393JVB
Panasonic
CAP FILM 0.039UF 5% 1.6KVDC RAD

Lead Time: 9-12Days

-- --
4500
Total: $
ECW-H16363JVB
Panasonic
CAP FILM 0.036UF 5% 1.6KVDC RAD

Lead Time: 9-12Days

-- --
9400
Total: $
XC2C256-7FT256I
Amd
IC CPLD 256MC 6.7NS 256FTBGA

Lead Time: 9-12Days

-- --
7100
Total: $
BFC236716105
Vishay
CAP FILM 1UF 5% 63VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
300
Total: $
LAMXO2280E-3FTN256E
Lattice
IC CPLD 1140MC 5.1NS 256FTBGA

MPQ: 90

Lead Time: 9-12Days

-- --
4700
Total: $
BFC236712105
Vishay
CAP FILM 1UF 5% 63VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
3600
Total: $
LC4256ZC-45MN132C
Lattice
IC CPLD 256MC 4.5NS 132CSBGA

Lead Time: 9-12Days

-- --
8300
Total: $
BFC233613223
Vishay
CAP FILM 0.022UF 20% 630VDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
1600
Total: $
XCR3256XL-12FTG256I
Amd
IC CPLD 256MC 10.8NS 256FTBGA

Lead Time: 9-12Days

-- --
2000
Total: $
BFC230358224
Vishay
CAP FILM 0.22UF 5% 400VDC RADIAL

Lead Time: 9-12Days

-- --
5300
Total: $
XCR3256XL-12FT256I
Amd
IC CPLD 256MC 10.8NS 256FTBGA

Lead Time: 9-12Days

-- --
9000
Total: $
BFC230344394
Vishay
CAP FILM 0.39UF 5% 250VDC RADIAL

Lead Time: 9-12Days

-- --
100
Total: $
M4A3-256/128-10FANI
Lattice
IC CPLD 256MC 10NS 256FPBGA

MPQ: 90

Lead Time: 9-12Days

-- --
100
Total: $
BFC247990217
Vishay
CAP FILM 0.047UF 5% 630VDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
5200
Total: $
XC2C256-6TQG144C
Amd
IC CPLD 256MC 5.7NS 144TQFP

MPQ: 1

Lead Time: 9-12Days

-- --
5100
Total: $
BFC247990168
Vishay
CAP FILM 0.082UF 5% 400VDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
9800
Total: $
  • 1
  • 6002
  • 6003
  • 6004
  • 6005
  • 6006
  • 6854
Go to