Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AD8402AR1-REEL
Analog Devices
IC DGTL POT 1KOHM 256TAP 14SOIC

Lead Time: 9-12Days

-- --
2100
Total: $
AD5274BRMZ-100-RL7
Analog Devices
IC DGT POT 100KOHM 256TAP 10MSOP

Lead Time: 9-12Days

-- --
7800
Total: $
AD5253BRUZ100-RL7
Analog Devices
IC DGT POT 100KOHM 64TAP 20TSSOP

Lead Time: 9-12Days

-- --
1800
Total: $
CAT5114ZI-10-T3
Onsemi
IC DGTL POT 10KOHM 32TAP 8MSOP

Lead Time: 9-12Days

-- --
9900
Total: $
AD5291BRUZ-50-RL7
Analog Devices
IC DGT POT 50KOHM 256TAP 14TSSOP

Lead Time: 9-12Days

-- --
6700
Total: $
BFC246855474
Vishay
CAP FILM 0.47UF 10% 400VDC RAD

MPQ: 850

Lead Time: 9-12Days

-- --
6700
Total: $
ISL22414WFU10Z-T7A
Renesas
IC DGTL POT 10KOHM 256TAP 10MSOP

Lead Time: 9-12Days

-- --
300
Total: $
AD5160BRJZ50-R2
Analog Devices
IC DGT POT 50KOHM 256TAP SOT23-8

Lead Time: 9-12Days

-- --
2200
Total: $
AD5246BKSZ10-R2
Analog Devices
IC DGTL POT 10KOHM 128TAP SC70-6

Lead Time: 9-12Days

-- --
900
Total: $
AD5273BRJZ1-R2
Analog Devices
IC DGTL POT 1KOHM 64TAP SOT23-8

Lead Time: 9-12Days

-- --
8500
Total: $
DS1847E-010
Analog Devices
IC DGTL POT 10KOHM 256TP 14TSSOP

Lead Time: 9-12Days

-- --
2400
Total: $
MKP1839468161
Vishay
CAP FILM 0.68UF 1% 160VDC AXIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
6500
Total: $
N57L5128TBD00TG
Onsemi
IC DGTL POT INTERFACE SOT23-8

Lead Time: 9-12Days

-- --
7800
Total: $
QXP2G684KRP7FP
Nichicon
CAP FILM 0.68UF 10% 400VDC RAD

Lead Time: 9-12Days

-- --
2600
Total: $
N57L5128TBD10TG
Onsemi
IC DGTL POT INTERFACE SOT23-8

Lead Time: 9-12Days

-- --
9600
Total: $
QXP2G684KRPT
Nichicon
CAP FILM 0.68UF 10% 400VDC RAD

Lead Time: 9-12Days

-- --
600
Total: $
KP1830315061
Vishay
CAP FILM 0.015UF 1% 63VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
6800
Total: $
N57M5114VP2D50TG
Onsemi
IC DGTL POT 50KOHM 32TAP 8TDFN

Lead Time: 9-12Days

-- --
2700
Total: $
N57M5114WD00TG
Onsemi
IC DGTL POT 100KOHM 32TAP 8SOIC

Lead Time: 9-12Days

-- --
2500
Total: $
N57M5114WD10TG
Onsemi
IC DGTL POT 10KOHM 32TAP 8SOIC

Lead Time: 9-12Days

-- --
5500
Total: $
  • 1
  • 5931
  • 5932
  • 5933
  • 5934
  • 5935
  • 6854
Go to