Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
GRM1555C1H4R7BA01D
Murata
0402 NPO 4.7pF 50V ±0.1pF

Lead Time: 9-12Days

-- --
3500
Total: $
GRM0335C1H101GA01D
Murata
MLCC 50V ±2% 100pF C0G

Lead Time: 9-12Days

-- --
8500
Total: $
GRM0335C1H3R0CA01D
Murata
Capacitor: ceramic; MLCC; 3pF; 50V; C0G (NP0); ±0.25pF; SMD;

Lead Time: 9-12Days

-- --
6700
Total: $
B72650M1300K072
Tdk
Var MLV 30VAC/34VDC 100A 47V 3225 SMD J-Lead

Lead Time: 9-12Days

-- --
4500
Total: $
LQP03TN2N6B02D
Murata
200mΩ 2.6nH 14@500MHz 500mA

Lead Time: 9-12Days

-- --
6500
Total: $
LQW15AN4N7G80D
Murata
71mΩ 4.7nH ±2% 1.2A

Lead Time: 9-12Days

-- --
6500
Total: $
LQW15AN8N2G80D
Murata
69mΩ 8.2nH ±2% 1.5A

Lead Time: 9-12Days

-- --
6900
Total: $
LQW18AN4N3C00D
Murata
59mΩ 4.3nH 850mA

Lead Time: 9-12Days

-- --
8500
Total: $
LQP03TN12NH02D
Murata
700mΩ 12nH ±3% 250mA

Lead Time: 9-12Days

-- --
8300
Total: $
OPA2348AQDRQ1
Texas Instruments
0.5V/us 1pA 1MHz

Lead Time: 9-12Days

-- --
4500
Total: $
SMD2920B260TF/24
Yageo
2920 2.6A

Lead Time: 9-12Days

-- --
2700
Total: $
SN74AUC1G17DCKR
Texas Instruments
SN74AUC1G17DCKR

Lead Time: 9-12Days

-- --
3300
Total: $
SN74HC20PWR
Texas Instruments
-IC-2--14-TSSOP

Lead Time: 9-12Days

-- --
5300
Total: $
SGM8249-1XN5G/TR
Sgmicro
SGM8249-1XN5G/TR

Lead Time: 9-12Days

-- --
1900
Total: $
TPS7A0312PDBVR
Texas Instruments
LDO 6V 200mA 1.2V

Lead Time: 9-12Days

-- --
3700
Total: $
UCC287502DBVR
Texas Instruments
Current-mode flyback controller with secondary-side regulation (SSR) for offline

Lead Time: 9-12Days

-- --
2500
Total: $
SMBJ15A/TR13
Yageo

Lead Time: 9-12Days

-- --
5300
Total: $
CC0603GRNPO9BN121
Yageo
Class

Lead Time: 9-12Days

-- --
1500
Total: $
GRM0335C1HR30WA01D
Murata
MLCC 50V 0.3pF C0G

Lead Time: 9-12Days

-- --
1900
Total: $
GRM0335C1H9R1BA01D
Murata
9.1pF-±0.1pF-50V--C0G-NP0-02010603-

Lead Time: 9-12Days

-- --
7500
Total: $
  • 1
  • 542
  • 543
  • 544
  • 545
  • 546
  • 6755
Go to