Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAX9314ECJ+
Analog Devices
IC CLK BUFFER 1:5 3GHZ 32LQFP

Lead Time: 9-12Days

-- --
6000
Total: $
54102-T0507LF
Amphenol
CONN HEADER VERT 14POS 2.54MM

Lead Time: 9-12Days

-- --
6600
Total: $
MAX9314ECJ+T
Analog Devices
IC CLK BUFFER 1:5 3GHZ 32LQFP

Lead Time: 9-12Days

-- --
5100
Total: $
8523CGLF
Renesas
IC CLK BUFFER 2:4 650MHZ 20TSSOP

Lead Time: 9-12Days

-- --
5500
Total: $
77773-308LF
Amphenol
CONN HEADER VERT 4POS 2.54MM

Lead Time: 9-12Days

-- --
7500
Total: $
8523CGLFT
Renesas
IC CLK BUFFER 2:4 650MHZ 20TSSOP

Lead Time: 9-12Days

-- --
8000
Total: $
8T39S11ANLGI8
Renesas
IC CLK BUFFER 3:11 2GHZ

MPQ: 2000

Lead Time: 9-12Days

-- --
200
Total: $
0026503077
Molex
CONN HEADER VERT 7POS 3.96MM

Lead Time: 9-12Days

-- --
4800
Total: $
PI6C4911504-01LIE
Diodes Incorporated
IC CLK BUFFER 2:4 1.5GHZ 20TSSOP

Lead Time: 9-12Days

-- --
6200
Total: $
0026503073
Molex
CONN HEADER VERT 7POS 3.96MM

Lead Time: 9-12Days

-- --
4700
Total: $
0026503071
Molex
CONN HEADER VERT 7POS 3.96MM

Lead Time: 9-12Days

-- --
2800
Total: $
0026503070
Molex
CONN HEADER VERT 7POS 3.96MM

Lead Time: 9-12Days

-- --
8700
Total: $
8304AMLN
Renesas
IC CLK BUFFER 1:4 200MHZ 8SOIC

Lead Time: 9-12Days

-- --
3400
Total: $
8304AMLNT
Renesas
IC CLK BUFFER 1:4 200MHZ 8SOIC

Lead Time: 9-12Days

-- --
4700
Total: $
79257-106HLF
Amphenol
BERGSTIK II

Lead Time: 9-12Days

-- --
7100
Total: $
8305AGI-02LF
Renesas
IC CLK BUFFER 2:4 250MHZ 16TSSOP

Lead Time: 9-12Days

-- --
500
Total: $
8305AGLF-TEJ
Renesas
IC CLK BUFFER 2:4 350MHZ 16TSSOP

Lead Time: 9-12Days

-- --
7000
Total: $
8305AGLFT-TEJ
Renesas
IC CLK BUFFER 2:4 350MHZ 16TSSOP

Lead Time: 9-12Days

-- --
8900
Total: $
78208-204HLF
Amphenol
CONN HEADER R/A 4POS 2.54MM

MPQ: 1000

Lead Time: 9-12Days

-- --
8500
Total: $
0416713473
Molex
CONN HEADER VERT 3POS 3.96MM

Lead Time: 9-12Days

-- --
3900
Total: $
  • 1
  • 5415
  • 5416
  • 5417
  • 5418
  • 5419
  • 6854
Go to