Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MPC941AER2
Renesas
IC CLK BUFFER 1:27 250MHZ 48TQFP

Lead Time: 9-12Days

-- --
6700
Total: $
3110-14-001-11-00
Cnc Tech
CONN HEADER VERT 14POS 2MM

Lead Time: 9-12Days

-- --
1900
Total: $
MPC9443AE
Renesas
IC CLK BUFFER 3:16 350MHZ 48TQFP

Lead Time: 9-12Days

-- --
700
Total: $
75867-201LF
Amphenol
CONN HEADER R/A 10POS 2.54MM

Lead Time: 9-12Days

-- --
8600
Total: $
008283076200000+
Kyocera Avx Components
WIRE TO BOARD

Lead Time: 9-12Days

-- --
6800
Total: $
MPC9446ACR2
Renesas
IC CLK BUFFER 2:10 250MHZ 32TQFP

Lead Time: 9-12Days

-- --
6700
Total: $
008283071200003+
Kyocera Avx Components
WIRE TO BOARD

Lead Time: 9-12Days

-- --
1000
Total: $
MPC9446FA
Renesas
IC CLK BUFFER 2:10 250MHZ 32TQFP

Lead Time: 9-12Days

-- --
2600
Total: $
008283071200002+
Kyocera Avx Components
WIRE TO BOARD

Lead Time: 9-12Days

-- --
7600
Total: $
MPC9447AC
Renesas
IC CLK BUFFER 2:9 350MHZ 32TQFP

Lead Time: 9-12Days

-- --
2100
Total: $
008283076200002+
Kyocera Avx Components
WIRE TO BOARD

Lead Time: 9-12Days

-- --
3200
Total: $
MPC9447ACR2
Renesas
IC CLK BUFFER 2:9 350MHZ 32TQFP

Lead Time: 9-12Days

-- --
4700
Total: $
008283071200001+
Kyocera Avx Components
WIRE TO BOARD

Lead Time: 9-12Days

-- --
0
Total: $
MPC9447FA
Renesas
IC CLK BUFFER 2:9 350MHZ 32TQFP

Lead Time: 9-12Days

-- --
3800
Total: $
BFC237368334
Vishay
CAP FILM 0.33UF 5% 630VDC RADIAL

MPQ: 450

Lead Time: 9-12Days

-- --
100
Total: $
MPC9448AC
Renesas
IC CLK BUFFER 1:12 350MHZ 32TQFP

Lead Time: 9-12Days

-- --
2800
Total: $
BFC233863154
Vishay
CAP FILM 0.15UF 10% 1KVDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
3200
Total: $
MPC9448ACR2
Renesas
IC CLK BUFFER 1:12 350MHZ 32TQFP

Lead Time: 9-12Days

-- --
0
Total: $
BFC233848115
Vishay
CAP FILM 0.68UF 20% 800VDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
5800
Total: $
MPC9448FA
Renesas
IC CLK BUFFER 1:12 350MHZ 32TQFP

Lead Time: 9-12Days

-- --
3800
Total: $
  • 1
  • 5167
  • 5168
  • 5169
  • 5170
  • 5171
  • 6854
Go to