Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IDT74FCT3807ASO8
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
8000
Total: $
TSM-102-01-T-EM
Samtec
CONN HEADER BRD EDGE 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
0
Total: $
IDT74FCT3807ASOI
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
3400
Total: $
FTR-102-02-G-S
Samtec
CONN HEADER SMD 2POS 1.27MM

MPQ: 1

Lead Time: 9-12Days

-- --
5700
Total: $
IDT74FCT3807ASOI8
Renesas
IC CLK BUFFER 1:10 100MHZ 20SOIC

Lead Time: 9-12Days

-- --
600
Total: $
74FCT3807DPGGI
Renesas
IC CLK BUF 1:10 166MHZ 20TSSOP

Lead Time: 9-12Days

-- --
6100
Total: $
TMM-103-01-F-S-RA
Samtec
CONN HEADER R/A 3POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
6800
Total: $
BDL-101-T-E
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
8900
Total: $
74FCT3807DPGGI8
Renesas
IC CLK BUF 1:10 166MHZ 20TSSOP

Lead Time: 9-12Days

-- --
7200
Total: $
77311-170-12LF
Amphenol
CONN HEADER VERT 12POS 2.54MM

Lead Time: 9-12Days

-- --
6300
Total: $
IDT74FCT3807DPGI
Renesas
IC CLK BUF 1:10 166MHZ 20TSSOP

Lead Time: 9-12Days

-- --
7200
Total: $
IDT74FCT3807DPGI8
Renesas
IC CLK BUF 1:10 166MHZ 20TSSOP

Lead Time: 9-12Days

-- --
1000
Total: $
IDT74FCT3807DPYI
Renesas
IC CLK BUFFER 1:10 166MHZ 20SSOP

Lead Time: 9-12Days

-- --
1500
Total: $
929838-01-02
3M
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
IDT74FCT3807DPYI8
Renesas
IC CLK BUFFER 1:10 166MHZ 20SSOP

Lead Time: 9-12Days

-- --
3600
Total: $
929745-02-01-EU
3M
CONN HEADER R/A 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
600
Total: $
IDT74FCT3807DQI
Renesas
IC CLK BUFFER 1:10 166MHZ 20QSOP

Lead Time: 9-12Days

-- --
2500
Total: $
929745-01-01-EU
3M
CONN HEADER R/A 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
1900
Total: $
IDT74FCT3807DQI8
Renesas
IC CLK BUFFER 1:10 166MHZ 20QSOP

Lead Time: 9-12Days

-- --
500
Total: $
929700-11-04-RK
3M
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2400
Total: $
  • 1
  • 5155
  • 5156
  • 5157
  • 5158
  • 5159
  • 6854
Go to