Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ERJ2RKF2401X
Panasonic
100mW 2.4kΩ ±1%

Lead Time: 9-12Days

-- --
3100
Total: $
ERA2AEB5491X
Panasonic
63mW 5.49kΩ ±0.1%

Lead Time: 9-12Days

-- --
3500
Total: $
ERJ2RKF2742X
Panasonic
100mW 27.4kΩ ±1%

Lead Time: 9-12Days

-- --
3700
Total: $
ERJ3EKF9092V
Panasonic
100mW 90.9kΩ ±1%

Lead Time: 9-12Days

-- --
4100
Total: $
ERJP06F5601V
Panasonic
Resistor: thick film; 0805; 5.6kΩ; 500mW;

Lead Time: 9-12Days

-- --
4300
Total: $
ERJ2RKF7500X
Panasonic

Lead Time: 9-12Days

-- --
4500
Total: $
ERJ2RKF4532X
Panasonic
100mW 45.3kΩ ±1%

Lead Time: 9-12Days

-- --
4700
Total: $
ERJ2RKF9092X
Panasonic
100mW 90.9kΩ ±1%

Lead Time: 9-12Days

-- --
5100
Total: $
ERJ2RKF5492X
Panasonic
100mW 54.9kΩ ±1%

Lead Time: 9-12Days

-- --
5300
Total: $
ERJ3EKF2701V
Panasonic
100mW 2.7kΩ ±1%

Lead Time: 9-12Days

-- --
5500
Total: $
ERJ2RKF3652X
Panasonic
SMD 36.5 kohm ± 1% 100 mW 0402 [1005]

Lead Time: 9-12Days

-- --
5900
Total: $
ERJP06F4701V
Panasonic

Lead Time: 9-12Days

-- --
5900
Total: $
PSTFAQ3416-600T020
Prod
60uH

Lead Time: 9-12Days

-- --
5700
Total: $
4D02WGF499JTCE
Uni-Royal
49.9Ω 62.5mW ±1%

Lead Time: 9-12Days

-- --
6100
Total: $
ERA2AEB243X
Panasonic
Resistor: thin film; SMD; 0402; 24kΩ; 62.5mW; ±0.1%;

Lead Time: 9-12Days

-- --
6900
Total: $
ERA2AEB751X
Panasonic

Lead Time: 9-12Days

-- --
7300
Total: $
ERJ2RKF3243X
Panasonic
100mW 324kΩ ±1%

Lead Time: 9-12Days

-- --
7700
Total: $
ERJ2RKF2700X
Panasonic
Resistor: thick film; SMD; 0402; 270Ω; 62.5mW; ±1%;

Lead Time: 9-12Days

-- --
7900
Total: $
ERA2AEB121X
Panasonic
63mW 120Ω ±0.1%

Lead Time: 9-12Days

-- --
8100
Total: $
ERA3VEB1000V
Panasonic
125mW 100Ω ±0.1%

Lead Time: 9-12Days

-- --
8300
Total: $
  • 1
  • 510
  • 511
  • 512
  • 513
  • 514
  • 6755
Go to